DOCUMENT Full-Text Rick Bryant.

On May 24, 1993, I met with Sergeant Swanson, construction manager for the trenching to be done in the parking lot behind Building #208. The trenching is in the area of site 48LA71L, the remains of two enlisted men's barracks built in 1885 which burned in the early 1920s. A trench 24 inches wide was to be dug across the parking lot, through the site area. Sgt Swanson was to notify me when trenching began. The artifacts from the trench were collected and are curated at the FE Warren Curation...


F.E. Warren AFB Project Metadata
PROJECT Uploaded by: Rachel Fernandez

Metadata for the F.E. Warren AFB collection.