National Archeological Database (NADB)

advanced

The National Archeological Database—a computerized communications network for the archeological and historic preservation community—was established to improve access to information on archeological activities nationwide.


Resources Inside This Collection (Viewing 4,701-4,800 of 257,992)

  • Documents (257,992)

  1. A Phase I Archaeological Survey of a Proposed Golf Course Expansion at Pine Mountain State Park, Bell County, Kentucky (1998)
  2. Phase I Archaeological Survey of a Proposed Hazardous Devices Training Area on Redstone Arsenal, Madison County, Alabama (1998)
  3. A Phase I Archaeological Survey of a Proposed Materials Pit in Association with Project No. ER-2734(1), Henry County, Alabama (1998)
  4. Phase I Archaeological Survey of a Proposed Surface Mine (Permit No. 813-0245) in Breathitt County, Kentucky (1998)
  5. Phase I Archaeological Survey of a Proposed Surface Mine in Bell County, Kentucky (1998)
  6. Phase I Archaeological Survey of a Proposed Surface Mine in Harlan County, Kentucky (1998)
  7. Phase I Archaeological Survey of a Proposed Surface Mine in Perry County, Kentucky (1998)
  8. A Phase I Archaeological Survey of a Proposed Wetlands Mitigation Bank for the Alabama Department of Transportation, 1st Division, in Northeast Jackson County, Alabama (1998)
  9. A Phase I Archaeological Survey of a Two Acre Borrow Site Located Near Gracey, Christian County, Kentucky (1998)
  10. A Phase I Archaeological Survey of an 18.7 Acre Tract Near Hilda, Rowan County, Kentucky (1998)
  11. A Phase I Archaeological Survey of an 8.5 Acre Borrow Site Located Near Pinkston School, Washington County, Kentucky (1998)
  12. A Phase I Archaeological Survey of CSAH 13 (SP 11-613) Cass County, Minnesota (1998)
  13. A Phase I Archaeological Survey of CSAH 36 from the Northern Junction with the Pacific Railroad Tracks Southeast to the Gull River (SAP 11-636-04), Cass County, Minnesota (1998)
  14. A Phase I Archaeological Survey of CSAH 8 from Bena to Federal Dam, Cass Coounty, Minnesota (1998)
  15. Phase I Archaeological Survey of Ground Disturbance Areas 4, 5, and 7 on Redstone Arsenal, Alabama, Volume I (1998)
  16. Phase I Archaeological Survey of Ground Disturbance Areas 4, 5, and 7 on Redstone Arsenal, Madison County, Alabama, Volume II (1998)
  17. A Phase I Archaeological Survey of Indian Road / County Road 95 (1998)
  18. Phase I Archaeological Survey of Proposed 23 Kilometer (14.5 Mile) Gas Pipeline from Jones Creek, Jackson County, Alabama to State Route 27, (North of) Sequatchie, Marion County, Tennessee: Addendum to the Final Report (Stage 2 Survey, Line (1998)
  19. A Phase I Archaeological Survey of Proposed Pine Pulpwood Harvest Tracts in Training Areas 3, 4, 8, 10, and 14, Fort Knox, Hardin and Meade Counties, Kentucky (1998)
  20. A Phase I Archaeological Survey of Proposed Telephone Line Right-Of-Ways Through Portions of the Daniel Boone National Forest, Jackson County, Kentucky (1998)
  21. A Phase I Archaeological Survey of Segments E, F, and H of the Proposed Realignment of US 460, Pike County, Kentucky (1998)
  22. Phase I Archaeological Survey of Selected Areas on Redstone Arsenal, Madison County, Alabama (1998)
  23. Phase I Archaeological Survey of Selected Areas on Redstone Arsenal, Madison County, Alabama (1998)
  24. A Phase I Archaeological Survey of TH 59 (SP 7506-16) from TH 28 to the North Stevens County Line, Stevens County, Minnesota (1998)
  25. Phase I Archaeological Survey of the Addington Enterprises, Inc. Revised Spring Fork #2 Coal Permit Area, Breathitt County, Kentucky. Report 98-19. (1998)
  26. Phase I Archaeological Survey of the Carriage Estates, Tract A, Subdivision, Anne Arundel County, Maryland (1998)
  27. Phase I Archaeological Survey of the Cypress Glen Subdivision, Anne Arundel County, Maryland (1998)
  28. A Phase I Archaeological Survey of the Industrial Parkway with an Historical Architecture Evaluation of Site 15GP315, Greenup, Boyd, and Carter Counties, Kentucky (1998)
  29. Phase I Archaeological Survey of the Northridge Subdivision, Anne Arundel County, Maryland (1998)
  30. A Phase I Archaeological Survey of the Owensboro-Daviess County Airport Runway Extension, Daviess County, Kentucky (1998)
  31. A Phase I Archaeological Survey of the Proposed Bryan Road Substation, Near Freemont, McCracken County, Kentucky (1998)
  32. A Phase I Archaeological Survey of the Proposed Cedar Creek Helipads Project Area, Fort Knox, Hardin County, Kentucky (1998)
  33. A Phase I Archaeological Survey of the Proposed Guntersville-Wyeth City Depot Rehabilitation Project, City of Guntersville, Marshall County, Alabama (1998)
  34. A Phase I Archaeological Survey of the Proposed Hackett Range Firing Line and Bleacher Area, Fort Knox, Hardin County, Kentucky (1998)
  35. A Phase I Archaeological Survey of the Proposed Natcher Parkway Extension, Warren County, Kentucky (1998)
  36. A Phase I Archaeological Survey of the Proposed Realignment of US 460 from Yeager to Pond Creek, Pike County, Kentucky (1998)
  37. A Phase I Archaeological Survey of the Proposed Water Storage Tank Site for the City of Irvington, Breckinridge County, Kentucky (1998)
  38. A Phase I Archaeological Survey of the Proposed Water Treatment Plant and Water Storage Tank Sites for the City of Brandenburg, Meade County, Kentucky (1998)
  39. Phase I Archaeological Survey of the Scheve Property, Anne Arundel County, Maryland (1998)
  40. Phase I Archaeological Survey of the South River Colony Subdivision (Parcel F), Anne Arundel County, Maryland (1998)
  41. A Phase I Archaeological Survey of the South Wastewater System, Madison County, Kentucky (1998)
  42. Phase I Archaeological Survey of the Springridge Subdivision, Anne Arundel County, Maryland (1998)
  43. Phase I Archaeological Survey of the Tucker Property, Anne Arundel County, Maryland (1998)
  44. Phase I Archaeological Survey of the Urciolo-Plattner Property, Anne Arundel County, Maryland (1998)
  45. A Phase I Archaeological Survey of the US 41A Realignment Corridor, Christian County, Kentucky (1998)
  46. A Phase I Archaeological Survey of the Waverly Bypass, Union County, Kentucky (1998)
  47. A Phase I Archaeological Survey of the West 4th Street Redevelopment Project and Phase II Testing of the Ebenezer Jenkins House, Maysville, Mason County, Kentucky (1998)
  48. A Phase I Archaeological Survey of the West Glasgow Electric Power Substation, Barren County, Kentucky (1998)
  49. Phase I Archaeological Survey of the Woods on Dividing Creek Subdivision, Anne Arundel County, Maryland (1998)
  50. A Phase I Archaeological Survey of Three Proposed Bivouac Areas in Training Area 12, Fort Knox, Meade County, Kentucky (1998)
  51. A Phase I Archaeological Survey of Two Alternate Routes for a 2.4 Mile Section of KY 114 Near Prestonsburg, Floyd County, Kentucky (1998)
  52. A Phase I Archaeological Survey of Two Alternate Routes for US 460 from Frenchburg to Mariba, Menifee County, Kentucky (1998)
  53. A Phase I Archaeological Survey of Two Alternates of the Proposed Realignment of KY 210 Between KY 1618 and Morning Star Road, LaRue County, Kentucky (1998)
  54. Phase I Archaeological Survey of Two Proposed Industrial Access Roads in Bridgeport, Jackson County, Alabama (1998)
  55. A Phase I Archaeological Survey of Two Proposed Materials Pits in Association with Project No. NHF-422(29), Russell County, Alabama (1998)
  56. Phase I Archaeological Survey of Two Proposed Retention Ponds at the Steeplechase Subdivision, Richwood, Kentucky (1998)
  57. Phase I Archaeological Survey, Bridge and Relief Bridge Replacement, U.S. 31 and Alabama River, Montgomery, Elmore and Autauga Counties, AL (1998)
  58. Phase I Archaeological Survey, Bridge Replacement and Road Realignment, Alabama 63 Over Elkhatchee Creek, Alexander City, Tallapoosa County, AL (1998)
  59. Phase I Archaeological Survey, Bridge Replacement, AL 17 Over Miles Creek, Chatom, Washington, DC (1998)
  60. Phase I Archaeological Survey, Bridge Replacement, State Route 10, West Fork of the Choctawhatchee River, Blue Springs, ALDOT#BR-342 (9), Barbour COunty, AL (1998)
  61. Phase I Archaeological Survey, Bridge Replacements, AL 17 Over Little Bassetts Creek and Two Relief Bridges, Chatom, Washington County, AL (1998)
  62. Phase I Archaeological Survey, Industrial Parkway Extension North of Old US 78 to Alabama 69, Jasper, Walker County, Alabama (1998)
  63. Phase I Archaeological Survey, Modifications and Expansion of Rest Areas, I-65, Greenville, Butler County, AL (1998)
  64. Phase I Archaeological Survey, Replacement of Railway Overpass and Road Modifications, US 231, Montgomery, Montgomery County, AL (1998)
  65. Phase I Archaeological Survey, Three Intersection Improvements, 4th Avenue, Bessemer, Jefferson County, AL (1998)
  66. Phase I Archaeological Survey, Two Bridge Replacements, Alabama 22 Over Jones and High Pine Creeks, Roanoke, Randolph County, AL (1998)
  67. Phase I Archaeological Survey, Widen Alabama 133, US 72 to South of Colbert Road 40, Muscle Shoals, Colbert County, AL (1998)
  68. Phase I Archaeological Survey, Widening of Martin Road from Redstone Arsenal, Gate 1, East to US 231, Huntsville, Madison County, Alabama (1998)
  69. A Phase I Archeological Survey Along Valley Avenue, Birmingham, Alabama (1998)
  70. Phase I Archeological Survey and Phase II Evaluations of Selected Areas of the West Rehoboth Expansion, Dewey Beach Sanitary Sewer District, Sussex County, Delaware (Draft As Final) (1998)
  71. A Phase I Archeological Survey for the Grelot Road Expansion Project (Schillinger Road to Cody Road Section), Mobile, Alabama (1998)
  72. A Phase I Archeological Survey of Land Parcel A, Marshall County, Kentucky. Contract Publication Series 98-86 (1998)
  73. A Phase I Archeological Survey of Land Parcel A1, Marshall County, Kentucky. Contract Publication Series 98-91 (1998)
  74. A Phase I Archeological Survey of Land Parcel B, Marshall County, Kentucky. Contract Publication Series 98-92 (1998)
  75. Phase I Archeological Survey of the Addington Enterprises, Inc. Spring Fork #3 Coal Permit Area, Breathitt County, Kentucky (1998)
  76. Phase I Archeological Survey of the Addington Enterprises, Inc., Brushy Fork Coal Permit Area, Pike County, Kentucky (1998)
  77. Phase I Archeological Survey of the Addington Enterprises, Inc., Long Fork Coal Permit Area, Pike County, Kentucky (1998)
  78. Phase I Archeological Survey of the Addington Enterprises, Inc., Spankum Branch Coal Permit Area, Pike County, Kentucky (1998)
  79. Phase I Archeological Survey of the Addington Enterprises, Inc., Spring Fork #4 Coal Permit Area, Breathitt County, Kentucky (1998)
  80. Phase I Archeological Survey of the Addington Mining, Inc., Breathitt County, Kentucky (1998)
  81. A Phase I Archeological Survey of the Cypress Bay Residential Development in Gulf Shores, Baldwin County, Alabama (1998)
  82. Phase I Archeological Survey of the Greenup County Fiscal Court Rockhouse Fork AML Water Supply Project, Greenup County, Kentucky (1998)
  83. Phase I Archeological Survey of the Hannco Energy Corporation Stillhouse Branch Coal Permit Area, Knott County, Kentucky (1998)
  84. Phase I Archeological Survey of the Ikerd Bandy Co., Inc. Van-Beaver Coal Permit Area, Bell and Knox Counties, Kentucky (1998)
  85. Phase I Archeological Survey of the KEM Coal Company, Ball Creek Job #28 Amendment 2 Area, Knott County, Kentucky (1998)
  86. Phase I Archeological Survey of the Locust Grove, Inc., Buffalo Creek Coal Permit Area, Perry County, Kentucky (1998)
  87. Phase I Archeological Survey of the Miller Brothers Coal, Inc., Big Caney Creek Coal Permit Area, Breathitt County, Kentucky (1998)
  88. Phase I Archeological Survey of the Miller Brothers Construction, Inc., Combs Branch Amendment 4 Area, Knott County, Kentucky (1998)
  89. Phase I Archeological Survey of the Mine Rite Coal Co., Morgan County, Kentucky (1998)
  90. Phase I Archeological Survey of the Nally and Hamilton Enterpries Inc. Big Laurel #3 Amendment 1 Coal-Permit Area, Harlan and Letcher Counties, Kentucky. Report 98-1 (1998)
  91. Phase I Archeological Survey of the Nally and Hamilton Enterprises, Inc., Lick Fork Coal Permit Area, Harlan County, Kentucky (1998)
  92. Phase I Archeological Survey of the No. 1 Contractors, Inc. Stony Point Coal Permit Area, Hopkins County, Kentucky (1998)
  93. A Phase I Archeological Survey of the Overton Acres Residential Development, Gulf Shores, Baldwin County, Alabama (1998)
  94. Phase I Archeological Survey of the Ruby Coal Company of London, Inc. Hogskin Branch Coal Permit Area, Clay County, Kentucky (1998)
  95. Phase I Archeological Survey of the Sand Hill Energy, Inc. Hammons Fork Coal Permit Area, Knox County, Kentucky (1998)
  96. Phase I Archeological Survey of the Sandlick Coal Company, Inc. Foresters Creek Coal Permit Area, Harlan County, Kentucky (1998)
  97. A Phase I Archeological Survey of Three Proposed Borrow Pits in Rowan County, Kentucky (1998)
  98. Phase I Archeological Survey of Three Proposed Dry Retention Basins in Eastern Daviess County, Kentucky (1998)
  99. A Phase I Cultural Resource and Historic Properties Investigation of the Proposed Gems, Inc. Skelton Creek Mine, Jefferson County, Alabama (1998)
  100. A Phase I Cultural Resource and Threatened and Endangered Species Survey of the Proposed ADL Water Plant, Madison County, Alabama (1998)