ARMS, NM HPD Office of Cultural Affairs Collection
Generated from a query to find all of the "ARMS, NM HPD Office of Cultural Affairs" resources
Site Name Keywords
AZ AA:15:107 (ASM) •
The Maja site
Site Type Keywords
Resource Extraction / Production / Transportation Structure or Features •
Road, Trail, and Related Structures or Features •
Quarry •
Trail •
Mine •
Agricultural or Herding •
Bridge •
Corral •
Reservoir •
Village
Other Keywords
Pipeline •
Cultural Resource •
Archeological Survey •
Archaeological Survey •
Oil •
Well Pad •
Inventory •
Cultural Resource Inventory •
Archaeological Clearance •
Archeological Clearance
Culture Keywords
Pueblo •
Plains •
Anasazi •
PaleoIndian •
Mimbres •
Dalton •
Mogollon •
French •
Archaic •
Mojave
Investigation Types
Archaeological Overview •
Data Recovery / Excavation •
Collections Research •
Reconnaissance / Survey •
Records Search / Inventory Checking •
Site Evaluation / Testing
Material Types
Shell •
Macrobotanical •
Metal •
Fauna •
Chipped Stone •
Building Materials •
Human Remains •
Ceramic •
Mineral •
Glass
Temporal Keywords
Historic •
Proto-Historic •
17th Century •
Contact Period •
Prehistoric •
Classic Period •
18th Century •
Tanque Verde Phase
Geographic Keywords
United States of America (Country) •
North America (Continent) •
US (ISO Country Code) •
New Mexico (State / Territory) •
35015 (Fips Code) •
Eddy (County) •
San Juan (County) •
35045 (Fips Code) •
Eddy County (County) •
San Juan County (County)
Resources Inside This Collection (Viewing 6,801-6,900 of 51,551)
- Documents (51,551)
- Addendum 1 Archaeological Survey of Phillips Petroleum's Proposed San Juan 31-6 Unit #33-E Well Pad and Access Road Rio Arriba County, New Mexico (1991)
- Addendum 1 Cultural Resources Survey of Amoco Production Company's Proposed Riddle ByPass Line San Juan County, New Mexico (1995)
- Addendum 1 Cultural Resources Survey of Phillips Petroleum's San Juan 29-6 No. 264 Well Pad Rio Arriba County, New Mexico (1995)
- Addendum 1 Foothills C #1 Well Location For Texahoma Oil & Gas Corp (1993)
- Addendum 1 Limited Testing At Site NM-G-51-10 For Graham Royalty (1990)
- Addendum 1 Oxnard #332 Well Tie Pipe Line Non-Arpa Testing For Meridian Oil (1990)
- Addendum 1 Post-Construction of 30 Homesites & 1.06 Miles Waterline For Ihs (1993)
- Addendum 1 Pump Mesa Gathering System For Amoco Production (1990)
- Addendum 1 Pump Mesa Gathering System For Meridian Oil (1990)
- Addendum 1 Realignment of Seismic Line 102-3-3 For Chuska Energy Co (1988)
- Addendum 1 To Additional Homes & Service Lines Near Standing Rock For Ihs (1990)
- Addendum 1 To Cultural Resources Survey of Universal Resources , Inc.'s Federal B Number 25 Well Pad Sandoval County, New Mexico (1995)
- Addendum 1 To Cultural Resources Survey of Universal Resources, Inc.'s Dunn Number 19 Well Pad and Pipeline Rio Arriba County, New Mexico (1995)
- Addendum 1 To Cultural Resources Survey of Universal Resources, Inc.'s Federal B Number 23 Well Pad and Access Road Sandoval County, New Mexico (1995)
- Addendum 1 To Lat MB-18 Pipe Line Non-Arpa Testing For Meridian Oil (1990)
- Addendum 1 To Manzanares Mesa Gathering System For Amoco Production (1990)
- Addendum 1 To Pump Canyon Unicon System Temp Use Areas 1-89 For Meridian Oil (1991)
- Addendum 1 To Report #347 Mariano Lake Water Line For Oeh / Phs (1983)
- Addendum 1 Well Pad (Nordhaus 12-1) For Union Texas Petroleum (1990)
- Addendum 10 To Pump Mesa Gathering System For Amoco Production Co (1990)
- Addendum 11 Trunk Ama Reroute & Temp Use Area #53 Pump Mesa For Amoco Production (1990)
- Addendum 11-Final Monitoring Rept Cedar Hill Gas Gathering System For Amoco Prod (1993)
- Addendum 12 Pipe Line R / Ws Near La Jara & Frances Canyons For Meridian Oil Co (1989)
- Addendum 12 Trunk Ama Reroute Pump Mesa Gathering System For Amoco Production (1990)
- Addendum 13 Additional Temp Use Areas Manzanares Mesa For Amoco Production (1990)
- Addendum 14 Temp Use Area #54 & #55 Pump Mesa Gathering For Amoco Production (1990)
- Addendum 15 Pump Mesa Gathering System For Amoco Production (1990)
- Addendum 15 To Additional Temp Use Areas 114-119 For Amoco Production (1990)
- Addendum 16 Pump Mesa Gathering System For Amoco Production (1990)
- Addendum 16 To Gartner A-11 Well Tie For Amoco Production (1990)
- Addendum 19 Pump Mesa Gathering System For Amoco Production (1990)
- Addendum 1: Clearance Work At Newcomb Preschool Site Burials For Nn COMM Dev (1990)
- Addendum 1: Homes Near Standing Rock For Office of Environmental Health & Engin (1990)
- Addendum 1: Manzanares Proj Trunk B Pipe Line For Williams Field Service (1990)
- Addendum 1: Water Line Extensions, Septic Tank Systems, For Homesites For Ihs (1990)
- Addendum 2 Additional Bradfords Lands For Fnf Construction (1992)
- Addendum 2 Manzanares Mesa Gathering System For Amoco Production (1990)
- Addendum 2 Reroute of Line a Ntua Power Line For Navajo Nation Utility (1987)
- Addendum 2 To 2 Sewer Lines For Oeh / Phs (1983)
- Addendum 2 To 4 Temp Use Areas On Sj 30-6 #442 For Meridian Oil Co (1990)
- Addendum 2 To Milagro To Conoco 4.5" Pipe Line For Trigon Engineering (1991)
- Addendum 2 To Nau Proj#923NM-G For Navajo Area Indian Health Service (1984)
- Addendum 2 To Report #708 the Naschitti South Water Line For Oeh / Phs (1983)
- Addendum 2 To Report #808 For Public Health Service Oeh (1984)
- Addendum 2 To System MB-16 Extension & Sj 32-9 #202 Well Tie For Meridian Oil (1991)
- Addendum 2 To: Cultural Resources Survey and Management Summary Meridian Oil Incorporated's Proposed Lateral MB-13 Loop Pipeline San Juan County, New Mexico (1996)
- Addendum 2 Water Lines, Septic Tanks Red Rock Area For Ihs (1986)
- Addendum 2 Well Pads & 1 Access Near Cedar Hill & Bloomfield For Mesa Operating (1990)
- Addendum 2. Inventory of Work Space Archaeological Survey Report For the Proposed Shell / Mobil CO2 Pipeline Santa Ana Pueblo Sandoval County, New Mexico (1981)
- Addendum 2.00 Miles Pipe Line To San Juan 30-6 #457 For Meridian Oil Co (1989)
- Addendum 20 Pump Mesa Gathering System For Amoco Production (1990)
- Addendum 23 Manzanares Mesa Gathering System For Amoco Production (1991)
- Addendum 25 Temp Use Areas Pump Mesa Gathering System For Amoco Production (1990)
- Addendum 26 To Pritchard SWD #1 Well Tie For Amoco Production (1990)
- Addendum 27 Trunk Ama & Lateral Ama-1 Reroutes Pump Mesa For Amoco Production (1990)
- Addendum 28 Further Trunk Ama & Lat Ama-1 Reroutes For Amoco Production (1990)
- Addendum 2: Additional Lines, Contractor's Yard, and Borrow Pit For Zuni Wastewater Collection System Facilities (1994)
- Addendum 2: New Gas Line & Power Line Reroute Coyote Canyon For Nn Utility (1990)
- Addendum 3 Cedar Hill Gas Gathering System For Amoco Production (1991)
- Addendum 3 Pipe Line R / Ws For El Paso Natural Gas (1991)
- Addendum 3 Pipe Line R / Ws For El Paso Nautral Gas (1991)
- Addendum 3 To Pump Canyon Unicon Pipe Line For Meridian Oil (1991)
- Addendum 4 To Cedar Hill Gas Gathering System For Amoco Production (1991)
- Addendum 4 To Rept 88-158 M R Charley Homesite (1990)
- Addendum 4 To Survey of Temp Use Areas For Amoco Production (1990)
- Addendum 5 Horse Canyon Pipe Line Extension For Amoco Production (1991)
- Addendum 5 of Cedar Hill Gathering System For Amoco Production (1991)
- Addendum 5 To Pump Mesa Gathering System (Temporary Use Areas) For Amoco Prod Co (1990)
- Addendum 6 Arch Survey Cedar Hill Gathering System For Amoco Produc (1991)
- Addendum 6 To Pump Mesa Gathering Sys (Schwertfeger Gas Com 1 Reroute) For Amoco (1990)
- Addendum 7 Arch Survey of Cedar Hill Gathering System For Amoco (1991)
- Addendum 7 To Pump Mesa Gathering System For Amoco Production Co (1990)
- Addendum 7 Water Well & Pipe Line R / W N Fork of Eagle Creek For Lincoln NF (1984)
- Addendum 75-Sjc-029 Block 6 Brains & Amarillo Canal Niip For BOR (1975)
- Addendum 8 Manzanares Mesa Gathering System Temp Use Areas For Amoco Production (1990)
- Addendum 8 Rincon Unit Gas Wells On Ensinada Mesa For Unocal (1992)
- Addendum 8 To Pump Mesa Gathering System For Amoco Production Co (1990)
- Addendum 8 Wells, Access Road & Pipe Line Ties For El Paso Natural Gas (1976)
- Addendum 8" Pipeline For Conoco Inc (1985)
- Addendum 83-275 N Hogback Mine Reclamation Proj For Navajo Reclamation (1983)
- Addendum 86-40a Alternate Access Route For Jerome P. McHugh Full Sail #4 (1986)
- Addendum 9 To Manzanares Mesa Gathering System For Amoco Production Co (1990)
- Addendum 9 To Pump Mesa Gathering System For Amoco Production Co (1990)
- Addendum a To an Archaeological Survey of Approximately 11 Acres of Sandia Pueblo Land, Bernalillo County, New Mexico (1987)
- Addendum a To B Crossover Pipe Line For Meridian Oil Co (1989)
- Addendum A: a Cultural Resources Survey For the Proposed Red Rock West Road In McKinley County, New Mexico (1995)
- Addendum Access Road, Road (Connally Fed Well #1) For Superior Oil (1982)
- Addendum Access Roads To Kringel Fed Well 1-4 8 / 21 / 81 For Brazos Petro. Co (1981)
- Addendum Additional Lands For Fnf Construction (1992)
- Addendum Additional Temp Access 2 Cathodic Protection Lines For Farmington Elec (1989)
- Addendum B To 15 Mile Transmission Line R / W For City of Farmington (1986)
- Addendum B Well Location Restake Sj 29-4 Carson 19 #1 For Falcon Seaboard Gas Co (1990)
- Addendum Bannon Fed 14-8 Well Pad & Access Near Lybrook, NM For Bannon Energy (1990)
- Addendum Bonito Diversity Extension of Cutting Unit 8 For Santa Fe NF-Jemez Rd (1992)
- Addendum Borrow Pit For Knc Construction (1983)
- Addendum Circulating Pit (Grooms Fed Well #1 / William B Barnhill) For Champlin (1983)
- Addendum Denton Fed Well #5 For Ray Westall (1982)
- Addendum Evergreen Nassau Lateral Pipe Line For Evergreen Operationg (1990)
- Addendum Expansion of Quarry For Borsberry Construction (1984)
- Addendum Exxon Fed Well #1 Access Road For Worth Petroleum (1985)