Archeological Clearance for Construction of a Sluice Channel and Access Road Adjacent To the Fremont River in the Headquarters Area of Capitol Reef National Park
Author(s): Norm Henderson
Year: 1987
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Archeological Clearance for Construction of a Sluice Channel and Access Road Adjacent To the Fremont River in the Headquarters Area of Capitol Reef National Park. Norm Henderson. 1987 ( tDAR id: 102462)
Keywords
Culture
Fremont
Investigation Types
Archaeological Overview
•
Site Evaluation / Testing
General
Archaeological Clearance
•
Archeological Clearance
•
No Cultural Resources
•
Significance
Geographic Keywords
49055 (Fips Code)
•
North America (Continent)
•
South Central Utah
•
United States of America (Country)
•
Utah (State / Territory)
•
Wayne (County)
Spatial Coverage
min long: -111.849; min lat: 38.15 ; max long: -109.885; max lat: 38.51 ;
Individual & Institutional Roles
Sponsor(s): National Park Service; NPS, Capitol Reef National Park, Tocky MT Region, Torrey, UT
Prepared By(s): NPS, Capitol Reef National Park, Rocky MT Region, Torrey, UT
Record Identifiers
NADB document id number(s): 865431
NADB citation id number(s): 000000106400
Notes
General Note: Submitted to: NPS, Capitol Reef National Park, Tocky MT Region, Torrey, UT
General Note: Sent from: NPS, Capitol Reef National Park, Rocky MT Region, Torrey, UT