Cultural Resources Report: the Proposed Installation of Approximately One (1) Mile of 12.5 Kv Electric Service Line To Serve the Cameron Mining Company Operation Located Two (2) Miles South of Round Mountain
Author(s): William A. Harrigan
Year: 1975
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Cultural Resources Report: the Proposed Installation of Approximately One (1) Mile of 12.5 Kv Electric Service Line To Serve the Cameron Mining Company Operation Located Two (2) Miles South of Round Mountain. William A. Harrigan. 1975 ( tDAR id: 131679)
Keywords
Investigation Types
Site Evaluation / Testing
General
Cultural Resource
•
Mining
•
Significance / Management
Geographic Keywords
32023 (Fips Code)
•
Nevada (State / Territory)
•
North America (Continent)
•
Nye (County)
•
Round Mountain QUAD
•
United States of America (Country)
Spatial Coverage
min long: -118.196; min lat: 35.964 ; max long: -115.001; max lat: 39.163 ;
Individual & Institutional Roles
Sponsor(s): Bureau of Land Management; BLM, Battle Mountain, NV
Prepared By(s): Sierra Pacific Power Company
Record Identifiers
NADB document id number(s): 1252159
NADB citation id number(s): 000000027737
Notes
General Note: Submitted to: BLM, Battle Mountain, NV
General Note: Sent from: Sierra Pacific Power Company