Cultural Resources Report: the Proposed Installation of Approximately Nine (9) Miles of 60 K.V. of Electric Service Line To Serve a Mining Operation of the Silver King Mining Co. Located in Tybo, Nevada
Author(s): William A. Harrigan
Year: 1975
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Cultural Resources Report: the Proposed Installation of Approximately Nine (9) Miles of 60 K.V. of Electric Service Line To Serve a Mining Operation of the Silver King Mining Co. Located in Tybo, Nevada. William A. Harrigan. 1975 ( tDAR id: 131681)
Keywords
Investigation Types
Site Evaluation / Testing
General
Cultural Resource
•
Lithic Scatter
•
Mining
•
Prehistory
•
Significance / Management
Geographic Keywords
32023 (Fips Code)
•
Nevada (State / Territory)
•
North America (Continent)
•
Nye (County)
•
Tybo QUAD
•
United States of America (Country)
Spatial Coverage
min long: -118.196; min lat: 35.964 ; max long: -115.001; max lat: 39.163 ;
Individual & Institutional Roles
Sponsor(s): Bureau of Land Management; BLM, Battle Mountain, NV
Prepared By(s): Sierra Pacific Power Company
Record Identifiers
NADB document id number(s): 1252157
NADB citation id number(s): 000000027735
Notes
General Note: Sent from: Sierra Pacific Power Company
General Note: Submitted to: BLM, Battle Mountain, NV