Northeast Corridor Improvement Program, Elimination of At-Grade Crossing, Groton, Connecticut, Project No. 59-109: Preliminary Case Report, Former West Mystic Railroad Station and Phase 1B Archeological Field Investigation

Author(s): Vollmer Associates, Inc.

Year: 1979

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Northeast Corridor Improvement Program, Elimination of At-Grade Crossing, Groton, Connecticut, Project No. 59-109: Preliminary Case Report, Former West Mystic Railroad Station and Phase 1B Archeological Field Investigation. Vollmer Associates, Inc.. 1979 ( tDAR id: 139924)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -72.467; min lat: 41.215 ; max long: -71.788; max lat: 41.714 ;

Individual & Institutional Roles

Sponsor(s): CT DOT

Prepared By(s): Vollmer Associates, Inc.

Record Identifiers

NADB document id number(s): 310

NADB citation id number(s): 000000078776

Notes

General Note: Submitted to: CT DOT

General Note: Sent from: Vollmer Associates, Inc.

General Note: Contract number: 59-109