Northeast Corridor Improvement Program, Elimination of At-Grade Crossing, Groton, Connecticut, Project No. 59-109: Preliminary Case Report, Former West Mystic Railroad Station and Phase 1B Archeological Field Investigation
Author(s): Vollmer Associates, Inc.
Year: 1979
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Northeast Corridor Improvement Program, Elimination of At-Grade Crossing, Groton, Connecticut, Project No. 59-109: Preliminary Case Report, Former West Mystic Railroad Station and Phase 1B Archeological Field Investigation. Vollmer Associates, Inc.. 1979 ( tDAR id: 139924)
Keywords
Site Type
Railroad
General
Field Reconnaisance--Intensive
•
Historic Building
•
Historic Resource Study
•
Prehistory
•
Site Settlement
•
Statement For Management
Geographic Keywords
09011 (Fips Code)
•
Connecticut (State / Territory)
•
Groton
•
Mystic River
•
New London (County)
•
North America (Continent)
•
United States of America (Country)
Temporal Keywords
Historic
Spatial Coverage
min long: -72.467; min lat: 41.215 ; max long: -71.788; max lat: 41.714 ;
Record Identifiers
NADB document id number(s): 310
NADB citation id number(s): 000000078776
Notes
General Note: Submitted to: CT DOT
General Note: Sent from: Vollmer Associates, Inc.
General Note: Contract number: 59-109