Fall / Winter 1977 Phase II Archaeological Testing at the Duck's Nest Site (40WR4) - Proposed State Route 55 Bypass Highway Construction Project Warren County, Tennessee

Author(s): Gerald W. Kline

Year: 1979

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Fall / Winter 1977 Phase II Archaeological Testing at the Duck's Nest Site (40WR4) - Proposed State Route 55 Bypass Highway Construction Project Warren County, Tennessee. Gerald W. Kline. 1979 ( tDAR id: 147799)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -85.998; min lat: 35.505 ; max long: -85.558; max lat: 35.852 ;

Individual & Institutional Roles

Sponsor(s): Department of Transportation; Tdot

Prepared By(s): Tdot

Record Identifiers

NADB document id number(s): 476157

NADB citation id number(s): 000000065671

Notes

General Note: Submitted to: Tdot

General Note: Sent from: Tdot