Phase I and II Cultural Resource Survey: Proposed County Road 23 Bridge Realignment and Road Realignment in Elk Township, Vinton County, Ohio

Author(s): Chuck Mustain

Year: 1990

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Phase I and II Cultural Resource Survey: Proposed County Road 23 Bridge Realignment and Road Realignment in Elk Township, Vinton County, Ohio. Chuck Mustain. 1990 ( tDAR id: 14832)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -82.763; min lat: 39.028 ; max long: -82.26; max lat: 39.396 ;

Individual & Institutional Roles

Sponsor(s): Ohio Department of Transportation, and E.P.

Prepared By(s): Archaeological Services Consultants, Inc.

Record Identifiers

NADB document id number(s): 31909

NADB citation id number(s): 000000145508

Notes

General Note: Submitted to: Ohio Department of Transportation, and E.P.

General Note: Sent from: Archaeological Services Consultants, Inc.