Phase I and II Cultural Resource Survey: Proposed County Road 23 Bridge Realignment and Road Realignment in Elk Township, Vinton County, Ohio
Author(s): Chuck Mustain
Year: 1990
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Phase I and II Cultural Resource Survey: Proposed County Road 23 Bridge Realignment and Road Realignment in Elk Township, Vinton County, Ohio. Chuck Mustain. 1990 ( tDAR id: 14832)
Keywords
Site Type
Bridge
General
Cultural Resource
Geographic Keywords
39163 (Fips Code)
•
Elk Township
•
North America (Continent)
•
Ohio (State / Territory)
•
United States of America (Country)
•
Vinton (County)
Spatial Coverage
min long: -82.763; min lat: 39.028 ; max long: -82.26; max lat: 39.396 ;
Individual & Institutional Roles
Sponsor(s): Ohio Department of Transportation, and E.P.
Prepared By(s): Archaeological Services Consultants, Inc.
Record Identifiers
NADB document id number(s): 31909
NADB citation id number(s): 000000145508
Notes
General Note: Submitted to: Ohio Department of Transportation, and E.P.
General Note: Sent from: Archaeological Services Consultants, Inc.