Phase I Archeological Survey of the Proposed PEPCO Brighten-High Ridge 500-KV Transmission Line Corridor in Montgomery and Howard Counties, Maryland
Author(s): Katherine J. Dinnel; Melanie D. Collier
Year: 1990
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Phase I Archeological Survey of the Proposed PEPCO Brighten-High Ridge 500-KV Transmission Line Corridor in Montgomery and Howard Counties, Maryland. Katherine J. Dinnel, Melanie D. Collier. 1990 ( tDAR id: 165983)
Keywords
General
Bare Island Point
•
Domestic Site
•
Farmstead
•
l8HO153
•
l8HO154
•
l8MO330
•
l8MO331
•
Lithic Scatters
•
Nicholls Saw and Gristmill
•
Rhyolite
•
Stone Lined Well
Geographic Keywords
24027 (Fips Code)
•
24031 (Fips Code)
•
Hammond Branch
•
Hawlings River
•
Howard (County)
•
Maryland (State / Territory)
•
Montgomery (County)
•
North America (Continent)
•
Patuxent River
•
Piedmont
•
United States of America (Country)
Temporal Keywords
l9th century
Spatial Coverage
min long: -77.528; min lat: 38.934 ; max long: -76.696; max lat: 39.369 ;
Individual & Institutional Roles
Sponsor(s): State, County, and Local Government; Potomac Electric Power Company
Prepared By(s): Greenhorne & O'Mara, Inc.
Record Identifiers
NADB document id number(s): 4499
NADB citation id number(s): 000000080915
Notes
General Note: Sent from: Greenhorne & O'Mara, Inc.
General Note: Submitted to: Potomac Electric Power Company