Archaeological Report for Project M-9062(1) and ACIR-85-1(110), Relocation of U.S. 280 and New Interchange at I-85 in Opelika, Lee County
Author(s): Alabama Highway Department
Year: 1991
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Archaeological Report for Project M-9062(1) and ACIR-85-1(110), Relocation of U.S. 280 and New Interchange at I-85 in Opelika, Lee County. Alabama Highway Department. 1991 ( tDAR id: 210699)
Keywords
Culture
20th Century
•
Early Archaic
•
Euroamerican
•
KIRK CORNER NOTCHED
Site Type
Artifact Scatter
•
House
Investigation Types
Site Evaluation / Testing
General
Alabama Highway Department
•
Architectural Survey
•
school
Geographic Keywords
01081 (Fips Code)
•
Alabama (State / Territory)
•
Lee (County)
•
North America (Continent)
•
Southeast
•
SOUTHERN PIEDMONT UPLAND
•
TALLAPOOSA RIVER DRAINAGE
•
United States of America (Country)
Temporal Keywords
Historic
•
Prehistoric
Spatial Coverage
min long: -85.697; min lat: 32.41 ; max long: -85.001; max lat: 32.747 ;
Individual & Institutional Roles
Sponsor(s): State, County, and Local Government; Alabama Highway Department, Montgomery, AL
Prepared By(s): In-house
Record Identifiers
NADB document id number(s): 4059408
NADB citation id number(s): 000000250654
Notes
General Note: Submitted to: Alabama Highway Department, Montgomery, AL
General Note: Sent from: In-house