Proposed Re-Routing of Water Seepage Around Wapa 230Kv Steel Transmission Tower at Mouth of Bighorn Canyon, Near Yellowtail Reservoir, Fort Smith

Author(s): Rolla Queen

Year: 1993

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Proposed Re-Routing of Water Seepage Around Wapa 230Kv Steel Transmission Tower at Mouth of Bighorn Canyon, Near Yellowtail Reservoir, Fort Smith. Rolla Queen. 1993 ( tDAR id: 222453)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -108.7; min lat: 44.994 ; max long: -106.264; max lat: 46.044 ;

Individual & Institutional Roles

Sponsor(s): BOR

Record Identifiers

NADB document id number(s): 3065034

NADB citation id number(s): 000000298207

Notes

General Note: Contract number: YT-93-064