Cultural Resource Management Plan: Flint River Hydroelectric Project (FERC #1218), Dougherty and Lee Counties, Georgia

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Cultural Resource Management Plan: Flint River Hydroelectric Project (FERC #1218), Dougherty and Lee Counties, Georgia. Jeffrey W. Gardner, Bobby G. Southerlin, Dawn M. Reid. 1998 ( tDAR id: 278449)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -84.458; min lat: 31.436 ; max long: -83.922; max lat: 31.916 ;

Individual & Institutional Roles

Sponsor(s): Georgia Power, Atlanta, GA

Prepared By(s): Brockington and Associates

Record Identifiers

NADB document id number(s): 4064353

NADB citation id number(s): 000000264125

Notes

General Note: Submitted to: Georgia Power, Atlanta, GA

General Note: Sent from: Brockington and Associates