A Phase I Archaeological Survey for FM-63(40)--55-63; a Proposed Bridge Replacement Marion County Road G76, Section 24, T74N-R20W over Hickory Creek, Marion County, Iowa
Author(s): John A. Molseed
Year: 1995
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
A Phase I Archaeological Survey for FM-63(40)--55-63; a Proposed Bridge Replacement Marion County Road G76, Section 24, T74N-R20W over Hickory Creek, Marion County, Iowa. John A. Molseed. Project Completion Report ,1. Iowa City, IA: Van Winkle-Jacob Engineering, Inc. 1995 ( tDAR id: 363235)
Keywords
Investigation Types
Archaeological Overview
Spatial Coverage
min long: -93.329; min lat: 41.161 ; max long: -92.87; max lat: 41.509 ;
Individual & Institutional Roles
Sponsor(s): Federal Highway Administration
Record Identifiers
NADB document id number(s): 648509
NADB citation id number(s): 000000314215