Summer Sites (38SU133) Macroplant Analysis
Part of the Archaeological Investigations at the Black Pond Site 38SU45, 38SU133, and 38SU145 project
Author(s): Leslie E. Raymer; Richard A. Fuss
Year: 2002
Summary
New South Associates, under the direction of Mr. Kenneth F. Styer, conducted intensive testing at 38SU133 in 1996. During the course of the excavations, a soil column consisting of eight 9.0 to 10.5 liter samples was collected from Test Unit 4, a I x 1 meter unit containing a ceramic cluster. Test Unit 4, Level 1 is the upper humus and sandy topsoil and Level 2 is the Interface between this zone and the next stratum. Levels 3 through 8 were excavated in 10 em arbitrary levels. This analysis was undertaken in order to assess the potential for floral and faunal preservation at this site.
Cite this Record
Summer Sites (38SU133) Macroplant Analysis. Leslie E. Raymer, Richard A. Fuss. New South Associates, Inc. . 2002 ( tDAR id: 381407) ; doi:10.6067/XCV8H70GRK
This Resource is Part of the Following Collections
Keywords
Material
Macrobotanical
•
Pollen
Site Name
38SU133
General
Flotation / Botanical Analysis
Geographic Keywords
Poinsett Range
•
Shaw Air Force Base
Spatial Coverage
min long: -80.535; min lat: 33.888 ; max long: -80.365; max lat: 34.006 ;
Individual & Institutional Roles
Contact(s): Shaw Air Force Base
Lab Director(s): Kenneth F. Styer
Principal Investigator(s): Charles E. Cantley
Landowner(s): United States Air Force
Sponsor(s): US Army Corps of Engineers, Fort Worth District; United States Air Force Air Combat Command
Prepared By(s): Geo-Marine, Inc.
Record Identifiers
D.O.(s): 001
Contract No.(s): DACA63-96-D-0038
Notes
General Note: This is a draft of an appendix of the data recovery report so there is no associated publication year.
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
nd_summer-sites-38su133-macroplant-analysis.pdf | 145.69kb | Feb 15, 2013 4:44:37 PM | Public |