Cultural Resources Survey of the Henry Tecklenburg Boulevard Extension Project

Author(s): Ralph Bailey; Pat Hendrix

Year: 2002

Summary

Brockington and Associates, Inc., conducted an intensive cultural resources survey of a 4.84

acre proposed extension of Henry Tecklenburg Boulevard in Charleston County, South Carolina in

July 2002. The project corridor is located at the junction of SC Route 61 Expressway and Magwood

Drive. Archaeologists conducted a systematic examination of the project tract following guidelines

established by the SCDAH (2000). We recovered no artifacts and encountered no intact cultural

deposits or features. We recommend no further management considerations of the project corridor

with regard to cultural resources.

Cite this Record

Cultural Resources Survey of the Henry Tecklenburg Boulevard Extension Project. Ralph Bailey, Pat Hendrix. Mt. Pleasant, SC: Brockington and Associates, Inc. 2002 ( tDAR id: 390996) ; doi:10.6067/XCV8RJ4KR6

This Resource is Part of the Following Collections

URL: http://artsandsciences.sc.edu/sciaa/


Spatial Coverage

min long: -80.014; min lat: 32.631 ; max long: -79.843; max lat: 32.815 ;

Individual & Institutional Roles

Contributor(s): Ralph Bailey; Pat Hendrix

Sponsor(s): Thomas and Hutton Engineering Co.

Prepared By(s): Brockington and Associates, Inc.

Notes

General Note: No finds were discovered during the survey of the tract.

File Information

  Name Size Creation Date Date Uploaded Access
combinedreport.pdf 1.66mb Apr 11, 2013 10:37:21 AM Confidential
redacted-combinedreport.pdf 860.41kb Apr 11, 2013 10:37:24 AM Public