Phase III Archeological Data Retrieval, National Grid Mohican-Batten Kill 115kV Transmission Line, Town of Moreau, Saratoga County, NY
Part of the MB #33 Precontact Site, Moreau, NY project
Author(s): Hartgen Archeological Associates, Inc.
Year: 2013
Summary
Phase III report for the MB #33 Precontact Site, a Late Woodland site on the Hudson River. Report written by Hartgen Archeological Associates, Inc. for National Grid (project sponsor). Report (.pdf) includes floral and faunal analyses and radiocarbon dating as appendices. Locational data redacted since the large portions of the site are still intact.
Cite this Record
Phase III Archeological Data Retrieval, National Grid Mohican-Batten Kill 115kV Transmission Line, Town of Moreau, Saratoga County, NY. Hartgen Archeological Associates, Inc.. 2013 ( tDAR id: 392040) ; doi:10.6067/XCV8639QNC
Keywords
Culture
Late Woodland
•
Mohican
•
Woodland
Material
Ceramic
•
Chipped Stone
•
Dating Sample
•
Fauna
•
Fire Cracked Rock
•
Ground Stone
•
Macrobotanical
Site Name
MB #33
Site Type
Domestic Structure or Architectural Complex
•
Resource Extraction / Production / Transportation Structure or Features
Investigation Types
Data Recovery / Excavation
•
Environment Research
•
Research Design / Data Recovery Plan
General
Hudson River
•
Late Woodland
•
Late Woodland Ceramics
•
Mohican
•
Pottery
Geographic Keywords
Hudson River
•
New York State
•
Northeast
Temporal Keywords
Late Woodland
Temporal Coverage
Radiocarbon Date: 1450 to 1280
Spatial Coverage
min long: -73.65; min lat: 43.125 ; max long: -73.521; max lat: 43.249 ;
Individual & Institutional Roles
Contact(s): Hartgen Archeological Associates, Inc.
Record Identifiers
Hartgen Archeological Associates, Inc. Project Number(s): 4347
New York State Office of Parks, Recreation and Historic Preservation Unique Site Number(s): A09113.000089
Notes
Redaction Note: Locational information has been redacted. Only part of the site was mitigated as much of the site was avoided through redesign.
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
MB-33-Precontact-Site-Phase-III-Report-Hartgen-4347.pdf | 5.42mb | Feb 12, 2014 | Feb 12, 2014 1:25:38 PM | Public | |
Phase III report (.pdf) |