A Cultural Resource Survey of 15.0 Miles Along the Salt River Project Coronado to Silverking 500 kV Transmission Line, Pleasant Valley Ranger District, Tonto National Forest, Gila County, Arizona

Author(s): Daniel H. Sorrell

Year: 2006

Summary

Salt River Project (SRP) maintains the 500-kilovolt (kV) Coronado to Silverking transmission line that traverses the Tonto National Forest (TNF), Gila County, Arizona. To control encroaching vegetation, SRP plans to employ the use of a Slashbuster® - a brush cutting and mulching device mounted onto heavy excavating equipment. The proposed action, which has the potential to impose adverse impacts upon cultural resources, requires permitting from TNF and, as such, is an undertaking subject to Section 106 of the National Historic Preservation Act (NHPA) of 1966, as amended. Accordingly, SRP requested that EcoPlan Associates, Inc. (EcoPlan) conduct a cultural resource investigation in advance of the project. The survey was carried out under Special Use Permit MES290, issued to EcoPlan by TNF.

This survey report was prepared to provide documentation of the cultural resources identified within the project area for SRP submittal to TNF. We assume that, per the terms of the Region 3 First Amended Programmatic Agreement Regarding Historic Property Protection and Responsibilities, TNF will provide the State Historic Preservation Office (SHPO) documentation of this survey report in its annual listing of undertakings for which TNF recognized findings of "no historic properties affected."

Cite this Record

A Cultural Resource Survey of 15.0 Miles Along the Salt River Project Coronado to Silverking 500 kV Transmission Line, Pleasant Valley Ranger District, Tonto National Forest, Gila County, Arizona, 9. Daniel H. Sorrell. 2006 ( tDAR id: 427769) ; doi:10.6067/XCV8427769

This Resource is Part of the Following Collections

Spatial Coverage

min long: -111.086; min lat: 33.825 ; max long: -110.448; max lat: 34.316 ;

Individual & Institutional Roles

Contact(s): Salt River Project Cultural Resource Manager

Contributor(s): Gretchen Gallagher; William Bryce; Lesley Rodriguez

Principal Investigator(s): J. Simon Bruder, Dr.

Sponsor(s): Salt River Project

Prepared By(s): EcoPlan Associates, Inc.

Submitted To(s): Tonto National Forest

Record Identifiers

EcoPlan Report Number(s): 04-715:9

Tonto National Forest Special Use Permit No.(s): MES290

File Information

  Name Size Creation Date Date Uploaded Access
2006_Bruder_ACulturalSilverking.pdf 26.81mb Nov 1, 2006 Feb 27, 2017 11:23:48 AM Confidential
This file is unredacted.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager