Coronado-Silverking Transmission Line (Other Keyword)

1-4 (4 Records)

Archaeological Studies, Salt River Project, Coronado Station: Addendum Report for Archaeological Survey of Tower Access Roads Along the Coronado-Silverking Transmission Line, Sitgreaves National Forest Segment (1978)
DOCUMENT Full-Text Dana Hartman.

In accordance with the NFS guidelines in the Cultural Resources Plan for Coronado Project (1977) and the recommendations listed in the main body of this report, a monitoring program was implemented on NFS lands in order to avoid damage to identified sites and to minimize accidental destruction of previously unrecognized resources. Museum of Northern Arizona Assistant Archaeologist Steve Dosh commenced the monitoring program on February 20, 1978. While the monitoring was in progress, Dosh...


Archeological Investigations, Salt River Project, Coronado-Silverking Transmission Line East of Forest Service Boundary to APS-SRP, Joint Corridor, Private and Federal Lands, Navajo County, Arizona: Report for Archeological Survey of the Proposed Coronado-Silverking Transmission Line East of Forest Service Boundary to APS-SRP Joint Corridor (Station 3969+69.75 to 4377+01.91) (1978)
DOCUMENT Full-Text Dana Hartman. David Kuehn.

An intensive archeological survey of about 7.7 mi. of Salt River Project (SRP) Coronado-Silverking 500 KV transmission line easement extending from just east of the Sitgreaves National Forest to the APS-SRP Joint Corridor was conducted by Museum of Northern Arizona archeologists in December, 1977. The survey was requested by Bettina Rosenberg, SRP Archeological Administrator, in a letter dated December 12, 1977. The survey was conducted and this report prepared under the stipulations and...


The Coronado Project Archaeological Investigations: A Description of Lithic Collections from the Railroad and Transmission Line Corridors (1984)
DOCUMENT Full-Text Claudia Berry.

During 1974-1978, the Museum of Northern Arizona conducted an extensive archaeological mitigation program for the Salt River Project prior to the construction of the Coronado Generating Plant near St. Johns, Arizona, and its energy corridors, the Coronado-Silver King Transmission Line and the Coronado Coal Haul Railroad. Lithic material from those corridors was separated from remaining project data and is reported herein. Objectives of this study are identification and description of all lithic...


A Cultural Resource Survey of 15.0 Miles Along the Salt River Project Coronado to Silverking 500 kV Transmission Line, Pleasant Valley Ranger District, Tonto National Forest, Gila County, Arizona (2006)
DOCUMENT Full-Text Daniel H. Sorrell.

Salt River Project (SRP) maintains the 500-kilovolt (kV) Coronado to Silverking transmission line that traverses the Tonto National Forest (TNF), Gila County, Arizona. To control encroaching vegetation, SRP plans to employ the use of a Slashbuster® - a brush cutting and mulching device mounted onto heavy excavating equipment. The proposed action, which has the potential to impose adverse impacts upon cultural resources, requires permitting from TNF and, as such, is an undertaking subject to...