Letter from Stan Graves to Richard Strimel, Housing Area 3 Central Air Conditioner Installation for 43 Units, Fort Sam Houston, Texas

Author(s): Stanley O. Graves

Year: 1991

Summary

This letter confirms the Texas Historical Commission's position on the installation of new central HVAC systems in Housing Area 3 at Fort Sam Houston. One of the Commission’s primary goals in this project is to preserve the character of public spaces in these historic homes as much as possible. This goal can be realized by installing all HVAC ductwork for service to the first floor in the basement and crawl space areas. This can be achieved through a sealed duct system or by laying a mud slab in the crawl space areas to prevent Chlordane from infiltrating the system. The Texas Historical Commission has consulted with their archeologists and find no problem archeologically with installing a mud slab.

Cite this Record

Letter from Stan Graves to Richard Strimel, Housing Area 3 Central Air Conditioner Installation for 43 Units, Fort Sam Houston, Texas. Stanley O. Graves. 1991 ( tDAR id: 432170) ; doi:10.48512/XCV8432170

Spatial Coverage

min long: -98.464; min lat: 29.445 ; max long: -98.41; max lat: 29.481 ;

Individual & Institutional Roles

Contact(s): Cultural Resource Office, Joint Base San Antonio

Repository(s): Fort Sam Houston

Prepared By(s): Texas Historical Commission

Submitted To(s): Environmental Management Office, Fort Sam Houston

File Information

  Name Size Creation Date Date Uploaded Access
19910718-To-FSH-SHPO-Housing-Area-3.pdf 774.24kb Apr 29, 2017 8:51:16 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Cultural Resource Office, Joint Base San Antonio