Salt River Project, Coronado Station: Mitigation Plans for Seven Impacted Bureau of Land Management Properties - NA14,638; NA14,640; NA14,642; NA14,650; NA15,208; NA13,911; NA14,869

Author(s): William S. Marmaduke

Year: 2017

Summary

Responding to a request from the Bureau of Land Management (BLM), Phoenix District, the Museum of Northern Arizona has prepared a description of work that the Museum will undertake at sites on BLM managed lands during the Coronado Station Archaeological Project. The total number of BLM sites impacted by Coronado Station construction is seven: five sites (NA's 14,638; 14,640; 14,642; 14,650; 15,208) in right-of-way of the Coal Haul Railroad, and two sites (NA13,911 and NA14,869) in the right-of-way of the Coronado-Silver King-Cholla Transmission System.

Mitigation studies at all sites adhere to the goals of the Coronado Project generally. A statement of these goals exists in the Coronado Project Research Design, a document that should be transmitted to BLM along with the present work.

Cite this Record

Salt River Project, Coronado Station: Mitigation Plans for Seven Impacted Bureau of Land Management Properties - NA14,638; NA14,640; NA14,642; NA14,650; NA15,208; NA13,911; NA14,869. William S. Marmaduke. 2017 ( tDAR id: 433667) ; doi:10.6067/XCV8433667

This Resource is Part of the Following Collections

Spatial Coverage

min long: -109.505; min lat: 34.364 ; max long: -109.063; max lat: 34.775 ;

File Information

  Name Size Creation Date Date Uploaded Access
Marmaduke_MitigationPlans_OCR_PDFA.pdf 4.51mb May 9, 2017 4:59:18 PM Confidential
This file is unredacted.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager