Finding Successful Solutions for Environmental, Engineering, Cultural Resources, and Public Relations Challenges at the Presidio of San Francisco, California

Author(s): Sean E McMurry

Year: 2015

Summary

In 2012-2014, AMEC successfully balanced the needs of the National Park Service (NPS), the Presidio Trust, and regulators to preserve historic resources, maintain public relations, engineer safe and effective solutions, and address environmental concerns during remediation activities to remove contaminated soil at the Presidio of San Francisco, a NHLD and NRHP-listed property. For over 150 years, the Presidio, located near the Golden Gate Bridge, was used by the U.S. Army to protect San Francisco. Remedial activities removed approximately 14,800 cubic yards of contaminated soil. Working with NPS staff, AMEC archaeologists developed an archaeological monitoring, sampling, and excavation strategy that preserved archaeological resources while keeping the project on schedule and budget. The 32 features recovered included a buried 1870s ammunition magazine and large, intact 1870s and 1890s coastal defense battery features. This presentation discusses the challenges of working in an archaeological landscape and the innovative techniques used during remedial excavations.

Cite this Record

Finding Successful Solutions for Environmental, Engineering, Cultural Resources, and Public Relations Challenges at the Presidio of San Francisco, California. Sean E McMurry. Presented at Society for Historical Archaeology, Seattle, Washington. 2015 ( tDAR id: 434018)

Keywords

Spatial Coverage

min long: -129.199; min lat: 24.495 ; max long: -66.973; max lat: 49.359 ;

Individual & Institutional Roles

Contact(s): Society for Historical Archaeology

Record Identifiers

PaperId(s): 339