Phase II Existing Conditions Assessment of Building 4190, Fort Sam Houston, Texas

Year: 2010

Summary

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan (ICRMP) for historic buildings and Army Regulations for building reduction.

Based on the Phase I ECA report for Building 4190, the Phase II ECA reviews the status of the building in the area development plans, determines reuse alternatives, and compares the Phase I estimated cost to rehabilitate the building to those of a recently renovated warehouse.

Cite this Record

Phase II Existing Conditions Assessment of Building 4190, Fort Sam Houston, Texas. 2010 ( tDAR id: 436417) ; doi:10.48512/XCV8436417

Spatial Coverage

min long: -98.465; min lat: 29.446 ; max long: -98.408; max lat: 29.484 ;

Individual & Institutional Roles

Contact(s): Cultural Resource Office, Joint Base San Antonio

Repository(s): Fort Sam Houston

Prepared By(s): CH2M HILL

Submitted To(s): US Army Corps of Engineers, Fort Worth District

Record Identifiers

Delivery Order Number(s): 013

Contract Number(s): W9126G-06-D-0400

File Information

  Name Size Creation Date Date Uploaded Access
2010-FSH-B4190-Existing-Condition--PhII.pdf 1.88mb Jun 18, 2017 8:27:25 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Cultural Resource Office, Joint Base San Antonio