Memorandums for the District Engineer, the Commanderof the Adelphi Laboratory Center, and a letter from Kise Franks & Straw
Part of the Blossom Point Project Page (DRAFT) project
Year: 1993
Summary
Multiple memorandums regarding submissions of reports conducted at Blossom Point. They include mentions of the Environmental Assessment and Phase I and II Archaeological Investigations. Reports are not included.
Cite this Record
Memorandums for the District Engineer, the Commanderof the Adelphi Laboratory Center, and a letter from Kise Franks & Straw. 1993 ( tDAR id: 445858) ; doi:10.6067/XCV8445858
Keywords
Site Name
18CH216
•
Ballast House
Site Type
Domestic Structure or Architectural Complex
•
Domestic Structures
•
House
Investigation Types
Heritage Management
General
Collections Management
Geographic Keywords
Blossom Point, MD
•
Cedar Neck Point
•
Charles County (County)
•
Maryland (State / Territory)
•
Nanjemoy Creek
•
Port Tobacco River
•
Potomac River
Spatial Coverage
min long: -79.514; min lat: 38.281 ; max long: -76.838; max lat: 39.749 ;
Individual & Institutional Roles
Contributor(s): U.S. Army Corps of Engineers, Baltimore District; Adelphi Laboratory Center; Kise Franks & Straw; Adelphi Research Laboratory
Repository(s): Adelphi Laboratory
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
BPI_0503_BallastHouseCorrespondence_1993_OCR_PDFA.pdf | 2.11mb | May 17, 2018 4:27:09 PM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below