Rehabilitation Report, Upper Yazoo Project 3A-2
Summary
The procedures employed by the U.S. Army Corps of Engineers (USACE), St. Louis District, Curation and Archives Analysis Branch, Mandatory Center of Expertise for the Curation and Management of Archaeological Collections to rehouse the archaeological material from USACE, Vicksburg District are discussed below. In the rehousing process of each investigative effort for the Vicksburg District collection, staff generally followed the same standard procedures. Upon completion of the curation management project, the Vicksburg District collection was sent to the Cobb Institute of Archaeology at Mississippi State University for permanent curation.
The artifact database can be found in tDAR at (https://core.tdar.org/dataset/446812)
Cite this Record
Rehabilitation Report, Upper Yazoo Project 3A-2. Brendan Daniels. 2018 ( tDAR id: 446817) ; doi:10.6067/XCV8446817
Keywords
Material
Building Materials
•
Ceramic
•
Chipped Stone
•
Fauna
•
Fire Cracked Rock
•
Glass
•
Ground Stone
•
Macrobotanical
•
Metal
•
Shell
Site Name
22LF686
•
Eagle Lake Site
Investigation Types
Heritage Management
•
Reconnaissance / Survey
General
Artifact Report
•
Collections Management
Geographic Keywords
Holmes (County)
•
Leflore (County)
•
Mississippi (State / Territory)
Spatial Coverage
min long: -91.934; min lat: 30.978 ; max long: -88.594; max lat: 34.886 ;
Individual & Institutional Roles
Principal Investigator(s): R. Christopher Goodwin
Landowner(s): US Army Corps of Engineers, Vicksburg District
Repository(s): Cobb Institute of Archaeology, Mississippi State University
Prepared By(s): US Army Corps of Engineers Mandatory Center of Expertise for the Curation and Management of Archaeological Collections, St. Louis District
Submitted To(s): US Army Corps of Engineers, Vicksburg District
Record Identifiers
Delivery Order(s): 6
Contract No.(s): DACW38-89-D-0039
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
A-Cultural-Resource-Survey--Upper-Yazoo-Project-1990-Rehabilit... | 506.47kb | Oct 15, 2018 12:25:16 PM | Public |