In July 2004, personnel from Argonne National Laboratory (Argonne) examined the Joe English Pond Dam archaeological site (state site number 27-HB-250) at New Boston Air Force Station (NBAFS) as part of the environmental review being conducted for rehabilitation of the dam. The dam is part of a mid-nineteenth century sawmill that was originally identified during a 1993 archaeological survey of the station conducted by Public Archaeology Laboratory, Inc. (PAL 1993). Site 27-HB-250 is located on the southeast corner of Joe English Pond near the center of the station (Figure 1). This report presents the findings from the Argonne archaeological investigations and includes recommendations for mitigating the impacts on archaeological sites that could result from the dam rehabilitation project. Also included in this report is a recommendation that site 27-HB-250 be determined as being eligible for listing on the National Register of Historic Places (NRHP).
Cite this Record
Final Preliminary Results of the Archaeological Examination of the Joe English Pond Dam, Site 27-HS-250, New Boston Air Force Station, Hillsborough County, New Hampshire. Daniel J. O'Rourke, Douglas Kullen. 2004 ( tDAR id: 447964) ; doi:10.6067/XCV8447964
This Resource is Part of the Following Collections
Keywords
Culture
Historic
Material
Building Materials
•
Glass
•
Metal
•
stone walls
Site Name
27-HB-250
•
Joe English Pond Dam
Site Type
Dam
•
Mill
•
Non-Domestic Structures
•
Sawmill
•
Water Control Feature
Investigation Types
Consultation
General
Dam Rehabilitation
•
Mitigation
Geographic Keywords
Hillsborough
•
New Boston Air Force Station
•
New Hampshire (State / Territory)
Temporal Coverage
None: 1841 to 1882
Individual & Institutional Roles
Contact(s): New Boston Air Force Station
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
Final-Prelim-JED-Assessment_Argonne-report.pdf | 5.35mb | Jan 4, 2019 1:24:26 PM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): New Boston Air Force Station