Phase I Archaeological Survey of Timber Harvest and Thinning Areas Scheduled for the Calendar Years 1998 Through 2000 Arnold Air Force Base/Engineering Development Center, Coffee and Franklin Counties, Tennessee

Author(s): Jodi L. Johnson

Year: 1998

Summary

Field work for this project was undertaken in early 1997. Investigators examined approximately 460 acres in 31 tracts of timber harvesting areas. A pedestrian examination of each tract was done by walking transects spaced at 20 m intervals. Investigators excavated 50 cm diameter shovel tests at random locations in the various tracts, generally avoiding steep slopes or swampy ground. No archaeological sites were recorded as a result of this work.

Cite this Record

Phase I Archaeological Survey of Timber Harvest and Thinning Areas Scheduled for the Calendar Years 1998 Through 2000 Arnold Air Force Base/Engineering Development Center, Coffee and Franklin Counties, Tennessee. Jodi L. Johnson. 1998 ( tDAR id: 469699) ; doi:10.48512/XCV8469699

This Resource is Part of the Following Collections

Spatial Coverage

min long: -86.236; min lat: 35.3 ; max long: -85.918; max lat: 35.473 ;

Individual & Institutional Roles

Contact(s): Arnold Air Force Base CRM Manager

Record Identifiers

Contract No.(s): TNFO 077-01-15-97

File Information

  Name Size Creation Date Date Uploaded Access
1998-01-001.pdf 3.21mb Jul 22, 2022 1:59:02 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Arnold Air Force Base CRM Manager