A Phase I Survey of Two Temporary Evapotranspiration Monitoring Stations
Author(s): Richard Alvey
Year: 2004
Summary
On November 21, 2003 a Phase I reconnaissance survey for cultural resources was conducted at the proposed locations of two instrument stations for evapotranspiration monitoring. The instrument stations are located on Arnold Engineering Development Center/Arnold Air Force Base (AEDC/AAFB). This survey was conducted in response to Air Force form AF813 number AAFB-04-007 which had been submitted for consideration of its environmental impact. The areas to be affected by each instrument station measures four feet in length two feet in width and are four feet deep. Each location was shovel tested and both tests were negative for cultural resources.
Cite this Record
A Phase I Survey of Two Temporary Evapotranspiration Monitoring Stations. Richard Alvey. 2004 ( tDAR id: 469706) ; doi:10.48512/XCV8469706
Keywords
Site Name
40CF291
•
E3019-1
•
E3019-2
•
E30193
•
E30194
Site Type
Farmstead
•
The Norris Farm
Investigation Types
Reconnaissance / Survey
General
Evapotranspiration Monitoring Station
•
Integrated Ecosystem Management Plan
•
Negative Result
Geographic Keywords
Arnold Air Force Base
•
Coffee (County)
•
Franklin (County)
•
Tennessee
Spatial Coverage
min long: -86.236; min lat: 35.3 ; max long: -85.918; max lat: 35.473 ;
Individual & Institutional Roles
Contact(s): Arnold Air Force Base CRM Manager
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
2004-01-001.pdf | 1.64mb | Jul 22, 2022 1:59:22 PM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Arnold Air Force Base CRM Manager