U.S. Air Force Integrated Cultural Resources Management Plant Peterson Air Force Base
Year: 2019
Summary
At the installation level, this ICRMP includes a brief historical context and a general description of the built environment components (Sections 2.0 and 8.0). Historic preservation issues and requirements are identified as is a practical step-by-step discussion regarding how to apply the compliance and consultation process under Section 306108 of the NHPA (Section 7.3). SOPs relevant to Cultural Resources Management Program (CRMP) compliance are included (Section 7.0) as is the contact information for key persons who may be involved in Section 306102 and 306108 compliance and consultation process each day (Section 7.9). This document also includes a brief discussion regarding forthcoming CRMP activities on Peterson Air Force Base (PAFB) (Section 10.0).
Cite this Record
U.S. Air Force Integrated Cultural Resources Management Plant Peterson Air Force Base. 2019 ( tDAR id: 470605) ; doi:10.48512/XCV8470605
Keywords
Site Name
5EP.1312
•
5EP.1313
•
5EP2178
•
5EP6394
•
5EP711
•
5EP712
•
5EP713
•
Building 979
•
Building 980
•
Building 981
•
Building 982
•
Building 999
Investigation Types
Heritage Management
Spatial Coverage
min long: -104.74; min lat: 38.757 ; max long: -104.638; max lat: 38.853 ;
Individual & Institutional Roles
Contact(s): Peterson Space Force Base CRM Manager
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
PAFB-2020-ICRMP.pdf | 1.78mb | Oct 4, 2022 1:10:36 PM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Peterson Space Force Base CRM Manager