Class III Cultural Resource Inventory of 175.4 Acres for the Salt River Project Abel-Pfister-Ball 230kV Transmission Line in the City of Mesa, the Towns of Gilbert and Queen Creek, and the San Tan Valley, Maricopa and Pinal Counties, Arizona

Summary

To meet increased demand for electricity due to growth, SRP plans to construct an approximately 20-mile (mi), double-circuit, 230-kilovolt (kV) transmission line including associated tubular steel pole structures that average 110–140 feet (ft) tall (Project). The Project would connect three 230/69kV receiving stations, including the Ball Substation in Gilbert, the Pfister Substation in southeastern Queen Creek, and the Abel Substation east of San Tan Valley. This Project was approved by the Arizona Corporation Commission (ACC) in 2009, when they issued a Certificate of Environmental Compatibility (CEC) (Decision No. 71441)

Cite this Record

Class III Cultural Resource Inventory of 175.4 Acres for the Salt River Project Abel-Pfister-Ball 230kV Transmission Line in the City of Mesa, the Towns of Gilbert and Queen Creek, and the San Tan Valley, Maricopa and Pinal Counties, Arizona. Jennifer K. Deats, Ximena Lemoine, Thomas Grew, Matthew Steber, Joshua Steinbeck. 2022 ( tDAR id: 475244) ; doi:10.48512/XCV8475244

This Resource is Part of the Following Collections

Individual & Institutional Roles

Contact(s): Daniel Garcia

Prepared By(s): PaleoWest, LLC

Submitted To(s): Salt River Project

Record Identifiers

Technical Report No.(s): 22-064

PaleoWest Project No.(s): 21-0966

ASM Accession No.(s): 2022-0049

File Information

  Name Size Creation Date Date Uploaded Access
Deats-2022-Cultural-Resource-Inventory-of-175.4-Acres-SRP-Abel... 13.56mb Apr 10, 2023 9:50:00 AM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Daniel Garcia