Class III Cultural Resource Inventory of 175.4 Acres for the Salt River Project Abel-Pfister-Ball 230kV Transmission Line in the City of Mesa, the Towns of Gilbert and Queen Creek, and the San Tan Valley, Maricopa and Pinal Counties, Arizona (2022)
DOCUMENT Full-Text Jennifer K. Deats. Ximena Lemoine. Thomas Grew. Matthew Steber. Joshua Steinbeck.

To meet increased demand for electricity due to growth, SRP plans to construct an approximately 20-mile (mi), double-circuit, 230-kilovolt (kV) transmission line including associated tubular steel pole structures that average 110–140 feet (ft) tall (Project). The Project would connect three 230/69kV receiving stations, including the Ball Substation in Gilbert, the Pfister Substation in southeastern Queen Creek, and the Abel Substation east of San Tan Valley. This Project was approved by the...


A Class III Cultural Resources Survey for the Union Pacific Railroad Company Pecos Industrial Rail Access and Train Extension (PIRATE) Project, Mesa and Queen Creek, Maricopa County, Arizona (2022)
DOCUMENT Full-Text Pamela J. Rainey. Michael Stubing.

Revised November 2022. UP is seeking authority from the Board to construct and operate approximately 6.0 miles of new rail line in Maricopa County, Arizona (Docket No. FD 36501). The proposed rail line would connect UP’s Phoenix Subdivision main line track to industrial properties southeast of the Phoenix-Mesa Gateway Airport via a single-track rail line accompanied by segments of support track. UP also proposes to construct and operate approximately 4.0 miles of new support track along the...


A Historic Properties Treatment Plan for Three Prehistoric Sites Along the Salt River Project's Proposed Abel-Pfister-Ball 230kV Transmission Line in the City of Mesa, the Towns of Gilbert and Queen Creek, and the San Tan Valley, Maricopa and Pinal Counties, Arizona (2022)
DOCUMENT Full-Text Lauren Brooks.

*On the title page of this report it says 'draft', however this is the final report. * To meet increased demand for electricity due to growth, SRP plans to construct an approximately 20-mile (mi), double-circuit, 230-kilovolt (kV) transmission line including associated tubular steel pole structures that average 110–140 feet (ft) tall (Project). The Project will connect three 230/69kV receiving stations, including the Ball Substation in Gilbert, the Pfister Substation in southeastern Queen...