An Application for Certificate of Environmental Compatibility - Proposed Transmission Line from Pinnacle Peak to Sunnyslope.
Author(s): James E. Ayres
Year: 1972
Summary
Only Exhibit E was scanned.
Report on the Survey of the Proposed Pinnacle Peak - Sunnyslope 230 kV Transmission Line. Along the proposed transmission line from Pinnacle Peak to Sunnyslope no historic or prehistoric remains were discovered within the rights-of-way of the proposed alternative routes.
Cite this Record
An Application for Certificate of Environmental Compatibility - Proposed Transmission Line from Pinnacle Peak to Sunnyslope.. James E. Ayres. 1972 ( tDAR id: 475252) ; doi:10.48512/XCV8475252
Keywords
Site Name
AZ T:8:5 (ASM)
•
Fort Mountain
Site Type
Petroglyph
•
Room Block / Compound / Pueblo
Investigation Types
Reconnaissance / Survey
General
Pinnacle Peak Substation
•
Pinnacle Peak Switching Station
•
Sunnyslope Substation
•
Sunnyslope Switching Station
Geographic Keywords
Maricopa (County)
Individual & Institutional Roles
Contact(s): Daniel Garcia
Submitted To(s): Arizona Public Service Company; Arizona Power Plant and Transmission Line Siting Committee
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
Ayres-1972-Application-for-CEC-for-Proposed-Pinnacle-Peak-Sunn... | 733.25kb | Apr 11, 2023 10:01:57 AM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Daniel Garcia