An Application for Certificate of Environmental Compatibility - Proposed Transmission Line from Pinnacle Peak to Sunnyslope.

Author(s): James E. Ayres

Year: 1972

Summary

Only Exhibit E was scanned.

Report on the Survey of the Proposed Pinnacle Peak - Sunnyslope 230 kV Transmission Line. Along the proposed transmission line from Pinnacle Peak to Sunnyslope no historic or prehistoric remains were discovered within the rights-of-way of the proposed alternative routes.

Cite this Record

An Application for Certificate of Environmental Compatibility - Proposed Transmission Line from Pinnacle Peak to Sunnyslope.. James E. Ayres. 1972 ( tDAR id: 475252) ; doi:10.48512/XCV8475252

This Resource is Part of the Following Collections

File Information

  Name Size Creation Date Date Uploaded Access
Ayres-1972-Application-for-CEC-for-Proposed-Pinnacle-Peak-Sunn... 733.25kb Apr 11, 2023 10:01:57 AM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Daniel Garcia