Archeological Monitoring for Salt River Project Coolidge-Hayden 115kV Transmission Line
Author(s): Jim Hasbargen
Year: 1997
Summary
Summary report of archaeological monitoring performed by SWCA along the SRP Coolidge to Hayden transmission line on February 11, 13, and 25, 1997.
Cite this Record
Archeological Monitoring for Salt River Project Coolidge-Hayden 115kV Transmission Line. Jim Hasbargen. 1997 ( tDAR id: 476304) ; doi:10.48512/XCV8476304
Keywords
Site Name
AZ AA:2:2 (ASM)
•
AZ U:15:127 (ASM)
•
AZ U:15:244 (ASM)
•
AZ U:15:245 (ASM)
•
AZ U:15:246 (ASM)
•
AZ U:16:252 (ASM)
•
AZ V:13:161 (ASM)
Investigation Types
Ground Disturbance Monitoring
General
115 kV Transmission Line
Individual & Institutional Roles
Contact(s): Daniel Garcia
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
Arch-Monitoring-SRP-Coolidge-to-Hayden-Transmission-Line-1997.pdf | 8.05mb | Jun 30, 2023 10:01:25 AM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Daniel Garcia