Draft Management Recommendations for the African Burial Ground. Chapter 6. Choices for the Future

Summary

Chapter 6 of the draft recommendations: This chapter examines alternative futures for the African Burial Ground. It describes four possible management scenarios, along with facilities and staffing requirements. Expanded programming from that currently offered is assumed in all alternatives, and estimated costs are discussed for each. Costs include facilities and associated staffing, and are expressed in 2005 dollars. The NPS technical assistance team conducted a charrette with architects, exhibit designers, and interpretive professionals to estimate space, exhibit and staffing needs for each alternative. Facilities needs resulting from the charrette were also confirmed utilizing a model developed by the National Park Service to determine visitor facility requirements in units of the National Park System. The relationship of the alternatives to interpretation and educational programming is more fully discussed in Chapter 7 of this report.

Cite this Record

Draft Management Recommendations for the African Burial Ground. Chapter 6. Choices for the Future. National Park Service. In Draft Management Recommendations for the African Burial Ground. 2006 ( tDAR id: 6751) ; doi:10.6067/XCV81R6NX5

This Resource is Part of the Following Collections

URL: http://www.africanburialground.gov/ABG_FinalReports.htm


Temporal Coverage

Calendar Date: 1640 to 1800

Spatial Coverage

min long: -74.019; min lat: 40.702 ; max long: -73.984; max lat: 40.734 ;

Individual & Institutional Roles

Contact(s): National Park Service

File Information

  Name Size Creation Date Date Uploaded Access
chapter6.pdf 102.91kb Jul 15, 2011 12:56:24 PM Public