Phase I Archaeological Investigation of County Road Improvement and Bridge Replacement Project FM-56(13)--55-56, Lee County, Iowa

Author(s): Anton Till; Michael Fokken

Year: 1986

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Phase I Archaeological Investigation of County Road Improvement and Bridge Replacement Project FM-56(13)--55-56, Lee County, Iowa. Anton Till, Michael Fokken. 1986 ( tDAR id: 93222)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -91.719; min lat: 40.375 ; max long: -91.112; max lat: 40.814 ;

Record Identifiers

NADB document id number(s): 642786

NADB citation id number(s): 000000138487

Notes

General Note: Sent from: Louis Berger and Associates, Inc., East Orange, NJ

General Note: Submitted to: Iowa Department of Transportation, Ames, IA