Caroline County (County) (Geographic Keyword)

26-50 (340 Records)

Archaeological Survey Proposed Forestry Activities Training Areas 21, 23, 24, and 30 Fort A.P. Hill, Caroline County, Virginia (2007)
DOCUMENT Full-Text John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with proposed forestry activities in 10 forestry blocks located in Training Areas 21, 23, 24, and 30, Fort A.P. Hill, Caroline County, Virginia. The proposed forestry activities will include two pine selection cuts (Blocks 24A06PS and 30A06PS), four pine thinnings (Blocks 21A06TH, 23A06TH,...


Archaeological Survey Proposed Forestry Activities Training Areas 21, 23, 24, and 30, Fort A.P. Hill (AP2012.001)
PROJECT Uploaded by: system user

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with proposed forestry activities in 10 forestry blocks located in Training Areas 21, 23, 24, and 30, Fort A.P. Hill, Caroline County, Virginia. The proposed forestry activities will include two pine selection cuts (Blocks 24A06PS and 30A06PS), four pine thinnings (Blocks 21A06TH, 23A06TH,...


Archaeological Survey Proposed Minehound Lanes Fort A.P. Hill, Caroline County, Virginia (2012)
DOCUMENT Full-Text John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental and Natural Resources Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with the construction of a Minehound Improvised Explosive Device Detection Site at Fort A.P. Hill, Caroline County, Virginia. The project consists of the construction of 12 1.5x36.5-meter (5x120-foot) training lanes spaced 6 meters (20 feet) apart. Each lane will include...


Archaeological Survey Ranges 8 & 9 Latrine Facilities Fort A.P. Hill, Caroline County, Virginia (2009)
DOCUMENT Full-Text John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with the proposed development of latrine facilities at Ranges 8 and 9 at Fort A.P. Hill, Caroline County, Virginia. The proposed undertaking will include the construction of an approximately 27-square-meter (290-square-foot) latrine building and associated parking lots near North Range Road,...


Archaeological Survey Training Facilities at Powers Road Corner, Fort A.P. Hill, Caroline County, Virginia (2009)
DOCUMENT Full-Text John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with proposed development of training facilities at Powers Road corner at Fort A.P. Hill, Caroline County, Virginia. The proposed training facilities will consist of Conex storage boxes placed at the intersection of Powers and Hood roads. Although the Conex boxes will be placed on the ground...


Archaeological Survey Wilcox Scrap Yard Fort A.P. Hill, Caroline County, Virginia (2010)
DOCUMENT Full-Text John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with the proposed expansion of facilities at the Wilcox scrap yard at Fort A.P. Hill, Caroline County, Virginia. The proposed undertaking will include the construction of an approximately 18-meter (60-foot) long by 7-meter (24-foot) wide loading ramp with a 3-meter (10-foot) wall at the high...


Archaeological Survey, Airfield Clearing Fort A.P. Hill, Caroline County, Virginia (2008)
DOCUMENT Full-Text John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with proposed clearing and grubbing at an airfield at Fort A.P. Hill, Caroline County, Virginia. The proposed airfield clearing will include the removal of trees and vegetation, grubbing, and seeding along the edges of an existing airfield. The Area of Potential Effect for the project includes...


Archaeological Survey, Airfield Clearing, Fort A. P. Hill (AP2012.001)
PROJECT Uploaded by: system user

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with proposed clearing and grubbing at an airfield at Fort A.P. Hill, Caroline County, Virginia. The proposed airfield clearing will include the removal of trees and vegetation, grubbing, and seeding along the edges of an existing airfield. The Area of Potential Effect for the project includes...


Archaeological Survey, American Water Administrative Building, Fort A.P. Hill (AP2012.001)
PROJECT Uploaded by: system user

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with the construction of a new administrative building for American Water at Fort A.P. Hill, Caroline County, Virginia. The project includes lot leveling and grubbing and the construction of an office/garage building. The area of potential effect for the undertaking includes 0.5 hectares (1.3...


Archaeological Survey, Bridge Replacements Perrin Road and Gregg/Lent Road, Fort A.P. Hill (AP2012.001)
PROJECT John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with the replacement of two existing bridges at Fort A.P. Hill, Caroline County, Virginia. The project includes (1) the removal of two extant wood bridges on Mill Creek, one located at Perrin Road and one at Gregg/Lent Road, and (2) the construction of two concrete bridges at those same...


Archaeological Survey, Bridge Replacements Perrin Road and Gregg/Lent Road, Fort A.P. Hill, Caroline County, Virginia (2008)
DOCUMENT Full-Text John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with the replacement of two existing bridges at Fort A.P. Hill, Caroline County, Virginia. The project includes (1) the removal of two extant wood bridges on Mill Creek, one located at Perrin Road and one at Gregg/Lent Road, and (2) the construction of two concrete bridges at those same...


Archaeological Survey, Burma Road Bridge Replacement Fort A.P. Hill, Caroline County, Virginia (2010)
DOCUMENT Full-Text John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with the replacement of an existing bridge at Fort A.P. Hill, Caroline County, Virginia. The project includes the removal of an extant steel beam bridge with wood deck and timber piles on Mount Creek and the construction of a new bridge at that same location. The area of potential effect for...


Archaeological Survey, Burma Road Bridge Replacement, Fort A.P. Hill (AP2012.001)
PROJECT Uploaded by: system user

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with the replacement of an existing bridge at Fort A.P. Hill, Caroline County, Virginia. The project includes the removal of an extant steel beam bridge with wood deck and timber piles on Mount Creek and the construction of a new bridge at that same location. The area of potential effect for...


Archaeological Survey, Directorate of Plans, Training, Mobilization, and Security, Fort A. P. Hill (AP2012.001)
PROJECT Uploaded by: system user

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with proposed tree removal at the Directorate of Plans, Training, Mobilization, and Security, Fort A.P. Hill, Caroline County, Virginia. The proposed tree removal will include pine thinning in the vicinity of the existing DPTMS facilities and grubbing along A.P. Hill Drive. The Area of...


Archaeological Survey, Firing Point 1, Fort A. P. Hill (AP2012.001)
PROJECT Uploaded by: system user

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I reconnaissance-level archaeological survey in association with proposed development of Firing Point 1 at Fort A.P. Hill, Caroline County, Virginia. Firing Point 1 is an active live-fire range located in an impact area. The proposed development will include clearing of vegetation and construction of berms and targetry. The current...


Archaeological Survey, Firing Point 1, Fort A.P. Hill, Caroline County, Virginia (2008)
DOCUMENT Full-Text John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I reconnaissance-level archaeological survey in association with proposed development of Firing Point 1 at Fort A.P. Hill, Caroline County, Virginia. Firing Point 1 is an active live-fire range located in an impact area. The proposed development will include clearing of vegetation and construction of berms and targetry. The current...


Archaeological Survey, Improvised Explosive Device Training Facilities, Fort A.P. Hill (AP2012.001)
PROJECT Uploaded by: system user

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with proposed development of training facilities on Woodford Road at Fort A.P. Hill, Caroline County, Virginia. The proposed training facilities will consist of a building and associated gravel parking lot on the south side of Woodford Road. The area of potential effect for this project was...


Archaeological Survey, Maneuver Corridors D, E, and F, Fort A.P. Hill (AP2012.001)
PROJECT Uploaded by: system user

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with the proposed construction of three maneuver corridors (MC) at Fort A.P. Hill, Caroline County, Virginia. The objective of the archaeological survey was to identify any historic properties that may be located within the APE and evaluate the potential eligibility of any such resources...


Archaeological Survey, Proposed Forestry Activities, Nine Blocks in the Impact Area, Fort A. P. Hill (AP2012.001)
PROJECT John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I reconnaissance-level archaeological survey in association with proposed forestry activities in nine forestry blocks located in the Impact Area at Fort A.P. Hill, Caroline County, Virginia. The proposed forestry activities will include one clearcut (Block IAA06CC), one pine seed tree cut (Block IAA06ST), one pine shelterwood cut...


Archaeological Survey, Proposed Minehound Lanes, Fort A.P. Hill (AP2012.001)
PROJECT Uploaded by: system user

The Fort A.P. Hill Cultural Resource Manager, under the Environmental and Natural Resources Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with the construction of a Minehound Improvised Explosive Device Detection Site at Fort A.P. Hill, Caroline County, Virginia. The project consists of the construction of 12 1.5x36.5-meter (5x120-foot) training lanes spaced 6 meters (20 feet) apart. Each lane will include...


Archaeological Survey, Proposed Temporary Breacher Facility Fort A.P. Hill, Caroline County, Virginia (2007)
DOCUMENT Full-Text John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed an archaeological survey in association with the proposed construction of a temporary breacher facility at Fort A.P. Hill, Caroline County, Virginia. The proposed undertaking will include road improvements and the construction of three concrete pads (one 50x100-foot slab for breach training facility, one 40x100-foot slab for a storage &...


Archaeological Survey, Proposed Temporary Breacher Facility, Fort A.P. Hill (AP2012.001)
PROJECT Uploaded by: system user

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed an archaeological survey in association with the proposed construction of a temporary breacher facility at Fort A.P. Hill, Caroline County, Virginia. The objective of the archaeological survey was to identify any historic properties that may be located within the APE and evaluate the potential eligibility of any such resources for...


Archaeological Survey, Proposed Tree Removal, Directorate of Plans, Training, Mobilization, and Security, Fort A.P. Hill, Caroline County, Virginia (2007)
DOCUMENT Full-Text John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with proposed tree removal at the Directorate of Plans, Training, Mobilization, and Security, Fort A.P. Hill, Caroline County, Virginia. The proposed tree removal will include pine thinning in the vicinity of the existing DPTMS facilities and grubbing along A.P. Hill Drive. The Area of...


Archaeological Survey, Ranges 8 & 9 Latrine Facilities, Fort A.P. Hill (AP2012.001)
PROJECT Uploaded by: system user

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I archaeological survey in association with the proposed development of latrine facilities at Ranges 8 and 9 at Fort A.P. Hill, Caroline County, Virginia. The proposed undertaking will include the construction of an approximately 27-square-meter (290-square-foot) latrine building and associated parking lots near North Range Road,...


Archaeological Survey, UAV Airstrip and Fire Training Center, Fort A.P. Hill (AP2012.001)
PROJECT John Mullin.

The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed Phase I reconnaissance-level archaeological survey in association with proposed development of (1) an unmanned aerial vehicle (UAV) airstrip and (2) a fire training center, at Fort A.P. Hill, Caroline County, Virginia. The objective of the archaeological survey was to identify any historic properties that may be located within the...