Maricopa (Geographic Keyword)

1-7 (7 Records)

Ak-Chin Archaeological Data Recovery Program (1986)
DOCUMENT Full-Text Cory Dale Breternitz. J. Brantley Jackson.

Soil Systems, Inc. has recently completed data recovery investigations at 30 Hohokam, Protohistoric and Historic sites on the Ak-Chin Indian Reservation south of Maricopa, Arizona. Fieldwork was conducted between April and October of 1985 on the west half of the reservation prior to development of farm lands by the Ak-Chin Indian Community. The work was sponsored by the U. S. Bureau of Reclamation as part of the Central Arizona Project Indian Distribution System authorized by Congress to allot...


An Archaeological Survey of Quail Substation Expansion, Pinal County, Arizona (1992)
DOCUMENT Full-Text Mark R. Hackbarth.

Northland Research, Inc. (Northland) conducted a Class III archaeological survey of the proposed Salt River Project (SRP) Quail Substation expansion. Prior to the survey, an examination of site files maintained by the Arizona State Museum and the Arizona State Historic Preservation Office was conducted. No previously recorded sites were reported within two miles of the vicinity. The General Land Office maps, curated by the Phoenix office of the Bureau of Land Management, were examined prior to...


The Archaeology of Two Historic Homestead and Railroad-Related Sites on the Southern Pacific Main Line Near Mobile, Maricopa County, Arizona (1990)
DOCUMENT Full-Text Lyle M. Stone. Scott L. Fedick.

In mid-to-late 1987, Archaeological Research Services, Inc. completed cultural resource test phase and data recovery investigations at two historic sites located adjacent to the Maricopa-Gila Bend Highway (State Route 238) in the vicinity of Mobile, Maricopa County, Arizona. These investigations of Site AZ T :15:11 (ASM), a complex of historic trash deposits and structural features, and Site AZ T :15:12 (ASM), a complex of historic trash deposits, were performed at the request of Dibble and...


Preliminary Results of Archaeological Testing at AZ U:9:226 (ASM) Within the Proposed Red Mountain Freeway Corridor (Gilbert Road to Higley Road), Mesa, Maricopa County, Arizona (2001)
DOCUMENT Full-Text Michael Stubing. Mary-Ellen Walsh. Laurene Montero.

Entranco conducted archaeological testing at AZ U:9:226 (ASM) in Mesa, Maricopa County, between November 3, 2000 and March 5, 2001. The testing was completed to evaluate the eligibility of AZ U:9:226 (ASM) for inclusion in the National Register of Historic Places (NRHP). The project was conducted at the request of the Arizona Department of Transportation prior to the proposed construction of the Red Mountain Freeway (RMF), Gilbert Road to Higley Road...


A Regional Archaeological Overview of the Montezuma Hydroelectric Pumped-Storage Project, Maricopa and Pinal Counties, Arizona (1975)
DOCUMENT Full-Text Susan S. Burton.

This report provides a regional archaeological overview prepared for the Montezuma Hydroelectric Pumped-Storage Project by the Office of Cultural Resource Management, Department of Anthropology, Arizona State University, under contract with the Salt River Project, Phoenix, Arizona. Specifically, it is designed to fulfill the archaeological data requirements for the Phase I Regional Study outlined by Wirth Associates, the consulting firm coordinating all environmental studies connected with the...


Report of the Museum of Northern Arizona On Archeological and Paleontological Reconnaissance and Excavation On Lands of the United States for the Calendar Year of 1978 (1979)
DOCUMENT Citation Only Anonymous.

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.


SRP 69 kV Subtransmission Line Reconductoring Project, Draft Environmental Assessment (2002)
DOCUMENT Full-Text Environmental Services Group, ENTRANCO, Inc..

This Environmental Assessment (EA) has been prepared to evaluate Salt River Project (SRP) proposed plans to perform major maintenance to two 69 kilovolt (kV) subtransmission lines within an SRP power line utility corridor easement. Although this project is not a Federal undertaking or action, this EA has been prepared in accordance with the guidelines contained in the Bureau of Indian Affairs (BIA) Manual Release No. 9303, NEPA Handbook, September 24, 1993. The manual provides guidance for...