Gila Bend (Geographic Keyword)

1-9 (9 Records)

American Recovery and Reinvestment Act 2009 Section 110 Compliance Report for the U.S. Army Corps of Engineers, Los Angeles Distrit, NHPA, Cultural Resources Investigations, Technical Report No. 13, Volume 2: Culture and Sustainability in the Gila Bend Area: A Class I Overview and Class III Cultural Resources Inventory of the Painted Rock Reservoir, Maricopa County, Arizona (2011)
DOCUMENT Full-Text Uploaded by: Jenny Cashman

This report presents the results of the Section 110 inventory and National Register of Historic Places (NRHP) evaluations of sites on U.S. Army Corps of Engineers (USACE) property at the Painted Rock Reservoir in southwestern Maricopa County, Arizona. The goals of this project were to conduct a Class I overview of 5,040 acres of fee-title land administered by the USACE at the reservoir and a Class III survey of 373 acres of these 5,040 acres where pedestrian survey was feasible and productive....


An Archaeological Survey of Two Staging Areas and a Portion of Two Parallel El Paso Natural Gas Company Pipelines Near Gillespie Dam on the Gila River, Maricopa County, Arizona (1991)
DOCUMENT Full-Text Robert B. Neily.

Archaeological Consulting Services, Ltd. (ACS) conducted a cultural resource survey of two segments of El Paso Natural Gas Company (EPNG) pipelines to be rerouted across the Gila River below Gillespie Dam. For reasons of safety, EPNG intends to bury the two lines that currently cross the river as bridges. In addition, two proposed staging areas for storage of pipe and equipment during the construction of the rerouted pipelines were also surveyed. The project was conducted at the request of Dr....


An Evaluation of Historic Cultural Resources in Relation to the Central Arizona Water Control Study (1984)
DOCUMENT Full-Text Lyle M. Stone. James E. Ayres.

This is a final, summary report on historic cultural resources in relation to the Central Arizona Water Control Study (CAWCS). The objectives of the CAWCS were to identify and evaluate alternative measures for flood control and regulatory water storage in Central Arizona in conjunction with construction of the Central Arizona Project. Having considered numerous alternative plans to meet these objectives, the Bureau of Reclamation defined a preferred alternative (Plan...


Intermontane Settlement Trends in the Eastern Papagueria: Cultural Resources Sample Survey in the Northeastern Barry M. Goldwater Range, Maricopa County, Arizona (1994)
DOCUMENT Full-Text Jeffrey A. Homburg. Jeffrey Altschul. Rein Vanderpot.

In 1989, 1992, and 1994, Statistical Research, Inc., conducted sample surveys of the three proposed helicopter gunnery ranges on the extreme northeast corner of the Barry M. Goldwater Range. The survey was completed for the Western Air Reserve National Guard under a contract with the U.S. Army Corps of Engineers, Los Angeles District. Approximately 15,000 acres were surveyed in all; a total of 130 archaeological sites was recorded. One hundred six of these were prehistoric, and 24 were historic....


Range 2: Cultural Resource Survey Between the Crater Range and the Sauceda Mountains, Barry M. Goldwater Air Force Range, Southwestern Arizona (1996)
DOCUMENT Full-Text Sharon K. Bauer. Kristopher S. Shepard. J. Simon Bruder.

This study was designed to assess the cultural resources within Range 2, which is contained within the Barry M. Goldwater Air Force Range. Data collected during this project will be used to augment the Cultural Resources Management Plan (CRMP) for the Gila Bend (eastern) segment of the Goldwater Range, a document that was prepared by the BLM, and which is regarded as "in-progress" as well as a CRMP that will be prepared specifically for the Air Force.


Range 4: Cultural Resource Survey Beyond the Sentinel Plain, Barry M. Goldwater Air Force Range, Southwestern Arizona (1996)
DOCUMENT Full-Text Deborah I. Olszewski. Sharon K. Bauer. Glenn P. Darrington. J. Simon Bruder.

This study was designed to assess the cultural resources contained within Range 4, which is part of the Barry M. Goldwater Air Force Range. Data collected during this project will be used to augment the Cultural Resources Management Plan (CRMP) for the Gila Bend (eastern) segment of the Goldwater Range, a document that was prepared by the BLM, and which is regarded as "in-progress," as well as a CRMP that will be prepared specifically for the Air Force.


Salt River Valley, Arizona (1907)
DOCUMENT Full-Text J. W. Crenshaw.

A promotional pamphlet to entice people to move to "A Land of Sunshine, Health and Prosperity. A Soil Unsurpassed in Productiveness. A Country of Wonderful Opportunities." by the Commissioner of Immigration of Maricopa County. "For sometime the tide of immigration has been turned towards the great Southwest and in recent years, by reason of the possibilities and opportunities offered in mining, stock raising and agricultural pursuits, Arizona, which for so long a time was regarded as a desert...


Targets: Cultural Resources Sample Survey of the East Tactical Range, Barry M. Goldwater Air Force Range, Southwestern Arizona (1994)
DOCUMENT Full-Text J. Simon Bruder. Kristopher S. Shepard. Glenn P. Darrington.

Luke AFB and the BLM have teamed up in the past to assess the cultural resources contained within the Barry M. Goldwater Air Force Range. This study was designed to further that effort, and specifically to provide data that can augment the Cultural Resources Management Plan (CRMP) for the Gila Bend (eastern) segment of the Goldwater Range, a document that was prepared by the BLM, and which is regarded as "in-progress."


Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona (2007)
DOCUMENT Full-Text T. Kathleen Henderson.

Salt River Project Agricultural  Improvement and  Power District  (SRP)  plans  to construct a new  500  kV  transmission  line  between  the  existing  Hassayampa  Switchyard,  west  of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line,  this  powerline  is  the  first  of two  that SRP  plans  to  eventually  construct between  the Hassayampa  Switchyard  and...