Architectural Survey (Investigation Type)

These investigations include field and/or document and records reviews to gather data on the presence and type of historic structures and provide a general understanding of architectural and cultural resources in an area.

1,376-1,400 (1,929 Records)

People at the End of the World (2010)
DOCUMENT Full-Text 611th Civil Engineer Squadron.

A brief historical summary of Shemya Island at Eareckson Air Station.


Perimeter Acquisition Vehicle Entry Phased Array Warning System (PAVE PAWS) facilities at Cape Cod Air Station (AS), Massachusetts (1999)
DOCUMENT Full-Text Charles R. Aukland.

Post-Cold War downsizing has resulted in a number of necessary changes to Cold War era facilities. Two of the Perimeter Acquisition Vehicle Entry Phased Array Warning System (PAVE PAWS) sites (Texas and Georgia) are no longer operational and have been partially dismantled. Several engineering projects required at the Cape Cod site have been determined to have adverse effects on the historic integrity of the radar facility. The Air Force, State Historic Preservation Officer, and the Advisory...


Perspectives in Vernacular Architecture (1982)
DOCUMENT Full-Text Uploaded by: system user

The Chesapeake Farm Buildings Survey was organized in the Fall of 1980 as a long-term effort to record seriously threatened agricultural buildings in the Tidewater region. The initial group of eight participants has expanded to roughly fifteen architectural historians, folklorists, and social historians. Bi-monthly meetings are held in Annapolis, Williamsburg, and Richmond. Buildings are identified and recorded by participants according to significance, likelihood of destruction, and...


Petroglyph Concentration Final Map (2010)
GEOSPATIAL Karen Holberg.

The aim of the LEAP projects was to publish multi-layered e-publications and develop and link them to associated digital archives. The original LEAP project was funded by the AHRC while the LEAP II, A Trans-Atlantic LEAP, was supported by the Andrew W. Mellon Foundation. This final map project is part of a 2011 LEAP II project "Placing immateriality: situating the material of highland Chiriquí" by Karen Holberg. The files contained in this record include an .mxd map project and an image of the...


Petroglyph_Concentration Shapefile (2010)
GEOSPATIAL Karen Holberg.

The aim of the LEAP projects was to publish multi-layered e-publications and develop and link them to associated digital archives. The original LEAP project was funded by the AHRC while the LEAP II, A Trans-Atlantic LEAP, was supported by the Andrew W. Mellon Foundation. This shapefile is part of a 2011 LEAP II project "Placing immateriality: situating the material of highland Chiriquí" by Karen Holberg. All files associated with this record must be downloaded to ensure that the shapefile...


Petroglyph_Viewshed Shapefile (2010)
GEOSPATIAL Karen Holberg.

The aim of the LEAP projects was to publish multi-layered e-publications and develop and link them to associated digital archives. The original LEAP project was funded by the AHRC while the LEAP II, A Trans-Atlantic LEAP, was supported by the Andrew W. Mellon Foundation. This shapefile is part of a 2011 LEAP II project "Placing immateriality: situating the material of highland Chiriquí" by Karen Holberg. All files associated with this record must be downloaded to ensure that the shapefile...


Petroglyphs Shapefile (2010)
GEOSPATIAL Karen Holberg.

The aim of the LEAP projects was to publish multi-layered e-publications and develop and link them to associated digital archives. The original LEAP project was funded by the AHRC while the LEAP II, A Trans-Atlantic LEAP, was supported by the Andrew W. Mellon Foundation. This shapefile is part of a 2011 LEAP II project "Placing immateriality: situating the material of highland Chiriquí" by Karen Holberg. All files associated with this record must be downloaded to ensure that the shapefile...


Phase 1 Archaeological Investigations at Griffiss Air Force Base, Rome, Oneida County, New York (1995)
DOCUMENT Full-Text Michael Cinquino. Edward V. Curtin. Elizabeth S. Burt. Mark A. Steinback.

Panamerican Consultants, Inc. was contracted by Tetra Tech, Inc. of San Bernardino, California in October o f 1994 to conduct a Phase I Archaeological Investigation at Griffiss Air Force Base in Rome, New York. A pedestrian survey was conducted to supply baseline archaeological site information for the installation and assess preliminary determinations of eligibility for the National Register of Historic Places. The results of this investigation were prepared for incorporation into the base...


Phase 1B Archaeological Survey: Proposed Bennington Substation, Town of Bennington, Bennington County, Vermont (2011)
DOCUMENT Full-Text The Louis Berger Group, Inc..

On behalf of Vermont Transco, LLC (VELCO), of Rutland, Vermont, The Louis Berger Group, Inc. (Berger), of Albany, New York, conducted a Phase IB archaeological survey for the proposed Bennington Substation, located in the Town of Bennington, Bennington County, Vermont. VELCO has determined an upgrade of the Bennington 115kV substation is required to meet the Independent System Operator of New England (ISONE) operating and reliability criteria. Subsurface survey was conducted at 18...


Phase I Archaeological Investigations for the North Augusta Water Treatment Plant Expansion Aiken County, South Carolina (2013)
DOCUMENT Full-Text William Green. Sarah Posin. Jennifer Betsworth.

"S&ME, Inc. (S&ME), on behalf of URS Corporation (URS), has completed a Phase I archaeological survey of approximately 6.8 acres at the proposed North Augusta Water Treatment Plant (WTP) Expansion in Aiken County, South Carolina. The project area is located immediately west of the Savannah River and north of the existing water treatment facility in North Augusta (Figures 1 and 2). This work was done in anticipation of compliance with Section 106 of the National Historic Preservation Act of 1966,...


Phase I Cultural Resource Survey of the York Street Bridge Replacement Project, City of Aiken, Aiken County, South Carolina (2011)
DOCUMENT Full-Text Natalie Adams. Valerie Davis. Summer Ciomek. Jackie Tyson.

"New South Associates, under subcontract to Davis & Floyd, conducted a Phase I Cultural Resource Survey of the proposed replacement of the York Street (S-2-31) bridges over the Norfolk Southern Railroad cut in response to a request by the South Carolina Department of Transportation (SCDOT). The proposed project, located within the Aiken Winter Colony Historic District II, would remove the existing low profile pair of wooden bridges and replace them with a one, two-lane concrete and masonry...


Phase I Cultural Resource Survey of US 278 (Williston Road) over Three Runs Creek, Aiken County, South Carolina (2011)
DOCUMENT Full-Text William Matthew Tankersley.

"The South Carolina Department of Transportation (SCDOT) plans to replace the existing bridge on US 278 over Upper Three Runs Creek (Bridge 1D #00000220027800500), which will include improvements to the existing road (Figure I). The project area extends 890 feet north and 610 feet south and 1,700 feet east and 1,470 west of the bridge over the Upper Three Runs Creek in Aiken County. The Area of Potential Effect (APE) is 300 feet either side of the existing centerline. The project area extended...


Phase I Cultural Resources Survey of 1.47 miles on SC 125 in North Augusta, Aiken County, South Carolina (2012)
DOCUMENT Full-Text Ramona Grunden.

"An approximately 1.47 mile long by 120 foot wide corridor on SC 125 (E. Buena Vista and Atomic Rd) in North Augusta. Proposed improvements include the addition of a center tum land, improved turning radii, a planted median and sections of new curb and sidewalk. The survey corridor includes commercial and residential areas as well as a government complex and public recreational facilities. Substantial drainage improvements are located along E. Buena Vista where an unnamed drainage parallels the...


Phase I Cultural Resources Survey of SC 126, Aiken County, South Carolina (2013)
DOCUMENT Full-Text Natalie Adams Pope. Kristie L. Person.

"This project consisted of background research, archaeological field survey, architectural field survey, and assessment of all archaeological sites and architectural resources for inclusion on the National Register of Historic Places (NRHP). The area of potential effect (APE) is defined as the construction limits and the view shed, which is 300 feet beyond the existing right-of-way (ROW). The area of archaeological emphasis in the APE is defined as 100 feet from the existing ROW. For...


Phase I Existing Conditions Assessment of Building 1026, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 1281, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard operating...


Phase I Existing Conditions Assessment of Building 189, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 197, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 198, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 199, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 2018, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 2019, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 2157, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 238, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 240, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard operating...