This report documents the results of a testing program completed by SWCA, Inc. Environmental Consultants in August of 1990 in anticipation of the modification of Bartlett Dam. Modifications to the dam were planned as part of the Central Arizona Project's Regulatory Storage Division (Plan 6) and the Safety of Dams Project. During the month of April, 1990, archaeologists from Northland Research, Inc. conducted an archaeological survey of approximately 929 acres located on the Lower Verde River...
The Beeline Archaeological Project (1990)
The Salt River Project (SRP) and Arizona Public Service Company (APS) constructed three transmission lines along a portion of the Beeline Highway on the Salt River Pima-Maricopa Indian Community (SRPMIC). SRP proposed to build a new line that connects the Pinnacle Peak, Brandow, and Papago Buttes substations. At the same time, APS proposed to realign two existing transmission lines and move them out of the Salt River channel and onto the north terrace above the river. Prior to construction,...