Desert Broom (Material Keyword)
1-2 (2 Records)
The Salt River Project (SRP) and Arizona Public Service Company (APS) constructed three transmission lines along a portion of the Beeline Highway on the Salt River Pima-Maricopa Indian Community (SRPMIC). SRP proposed to build a new line that connects the Pinnacle Peak, Brandow, and Papago Buttes substations. At the same time, APS proposed to realign two existing transmission lines and move them out of the Salt River channel and onto the north terrace above the river. Prior to construction,...
The Roosevelt Community Development Study, Number 14, Volume 3: Paleobiological and Osteological Analyses (1995)
The Roosevelt Community Development Study (RCD) involved the testing and excavation of 27 sites in the Lower Tonto Basin of central Arizona. This is one of three related data recovery projects undertaken in the Tonto Basin for the Bureau of Reclamation prior to the raising of the Roosevelt Lake dam. The results of the RCD project are presented in four Anthropological Papers of the Center for Desert Archaeology: Anthropological Papers No. 12 is the research design; Anthropological Papers No. 13...