The Beeline Archaeological Project (1990)
DOCUMENT Full-Text Richard W. Effland. Scott Fedick.

The Salt River Project (SRP) and Arizona Public Service Company (APS) constructed three transmission lines along a portion of the Beeline Highway on the Salt River Pima-Maricopa Indian Community (SRPMIC). SRP proposed to build a new line that connects the Pinnacle Peak, Brandow, and Papago Buttes substations. At the same time, APS proposed to realign two existing transmission lines and move them out of the Salt River channel and onto the north terrace above the river. Prior to construction,...


F.E. Warren AFB Project Metadata
PROJECT Uploaded by: Rachel Fernandez

Metadata for the F.E. Warren AFB collection.


Final Environmental Planning Technical Report Biological Resources (1984)
DOCUMENT Full-Text David Cameron.

The President has directed that the Air Force deploy the Peacekeeper missile system at a location near F.E. Warren Air Force Base (hereafter F.E. Warren AFB), close to Cheyenne, Wyoming. The Peacekeeper system (formerly known as the M-X system) is an advanced, land-based intercontinental ballistic missile. The plan calls for the replacement of 100 existing Minuteman III missiles with 100 Peacekeeper missiles. Existing missile silos will be used, and there will be very little structural...


Settlement, Subsistence, and Specialization In the Northern Periphery: The Waddell Project. Vols. 1 and 2 (1989)
DOCUMENT Full-Text Uploaded by: system user

Under the sponsorship of the Bureau of Reclamation, the New Waddell Dam Borrow Areas Mitigative Data Recovery Project, more simply known as the Waddell Project, performed data recovery at 17 sites in the vicinity of Lake Pleasant, Arizona. Supplemental surveys conducted under the same contract added two sites to the inventory slated for investigation. The project area, composed of multiple survey areas, was spread across two drainages, the Agua Fria and New River, in what is considered the...