Highway Improvement (Other Keyword)

Highway Improvements

1-6 (6 Records)

Cultural Resource Reconnaissance Survey of SC Route 302 (Silver Bluff Road) from SC Route 81 to S-2-1849 (2006)
DOCUMENT Full-Text Chad Long.

"The Department proposes to widen the existing two-lane ditch section of SC Route 302 between S-2-1849 and SC Route 81 to a three-lane curb and gutter section with a single sidewalk. Nine feet of new right of way will be required along the entire l.5-mile corridor. Existing right-of-way is 66 feet."


Cultural Resources Survey of the Coleman Bridge Road (S-152) Paving Project, Aiken County (2007)
DOCUMENT Full-Text Chad Long.

"The Department proposes to construct a two-lane, paved ditch section on S-152 (Coleman Bridge Road) between Quattlebaum Road and just east of Cedar Creek in Aiken County. The project will require 33 feet of new right-of-way on each side of the centerline. Variable slope permissions (67' max.) will also be required for grading and bank stabilization activities. The purpose of the project is to improve the road and connect the existing paved sections on S-152."


Cultural Resources Survey of the S-45 and S-901 Intersection Improvements Project, Aiken County, South Carolina (2010)
DOCUMENT Full-Text David Baluha.

"The project is for proposed improvements to the S-45 and S-901 intersection in North Augusta, South Carolina. The S-45 and S-901 Intersection Improvements Project includes the realignment of S-901 into S-45, the installation of left and right tum lanes on S-45, the clearing of vegetation, and the removal of existing pavement. These improvements, proposed by the Department Traffic Safety Office, are designed to reduce the numbers of rearend crashes and to improve traffic flow at the...


Cultural Resources Survey of the SC-118 and S-895 Intersection Improvements Project, Aiken County, South Carolina (2010)
DOCUMENT Full-Text David Baluha.

"The project is for proposed improvements to the SC-118 and S-895 intersection in Aiken, South Carolina. The SC-118 and S-895 Intersection Improvements Project includes the installation of left tum lanes on all approaches. These include new rights-of-way (ROW) extending approximately 500 feet north, south, east, and west of the intersection. These improvements, proposed by the Department Traffic Safety Office, are designed to reduce the numbers of rear-end crashes and to improve traffic flow at...


Phase I Cultural Resource Survey of US 278 (Williston Road) over Three Runs Creek, Aiken County, South Carolina (2011)
DOCUMENT Full-Text William Matthew Tankersley.

"The South Carolina Department of Transportation (SCDOT) plans to replace the existing bridge on US 278 over Upper Three Runs Creek (Bridge 1D #00000220027800500), which will include improvements to the existing road (Figure I). The project area extends 890 feet north and 610 feet south and 1,700 feet east and 1,470 west of the bridge over the Upper Three Runs Creek in Aiken County. The Area of Potential Effect (APE) is 300 feet either side of the existing centerline. The project area extended...


Phase I Cultural Resources Survey of 1.47 miles on SC 125 in North Augusta, Aiken County, South Carolina (2012)
DOCUMENT Full-Text Ramona Grunden.

"An approximately 1.47 mile long by 120 foot wide corridor on SC 125 (E. Buena Vista and Atomic Rd) in North Augusta. Proposed improvements include the addition of a center tum land, improved turning radii, a planted median and sections of new curb and sidewalk. The survey corridor includes commercial and residential areas as well as a government complex and public recreational facilities. Substantial drainage improvements are located along E. Buena Vista where an unnamed drainage parallels the...