Baling Wire (Other Keyword)

1-2 (2 Records)

The Beeline Archaeological Project (1990)
DOCUMENT Full-Text Richard W. Effland. Scott Fedick.

The Salt River Project (SRP) and Arizona Public Service Company (APS) constructed three transmission lines along a portion of the Beeline Highway on the Salt River Pima-Maricopa Indian Community (SRPMIC). SRP proposed to build a new line that connects the Pinnacle Peak, Brandow, and Papago Buttes substations. At the same time, APS proposed to realign two existing transmission lines and move them out of the Salt River channel and onto the north terrace above the river. Prior to construction,...


Cultural Resources Survey of a Portion of Dead Horse Ranch State Park, and a Proposed Alignment for a New Access Road in Yavapai County, Arizona (1991)
DOCUMENT Full-Text M. Zyniecki. Thomas N. Motsinger.

An archaeological survey of a portion of Dead Horse Ranch State Park, Yavapai County, Arizona, was completed for the Arizona Department of Transportation and Arizona State Parks by SWCA, Inc., Environmental Consultants, under contract to Entranco Engineers, Inc., in July 1990. The project was undertaken for a proposed new access road to the park and a bridge across the Verde River as well as for proposed improvements within the park. Sites AZ N:4:18 (ASM) and AZ N:4:31 (ASM) had been formally...