A Cultural Resources Survey of the Proposed Salt River Project 92nd Street Substation, Salt River Pima and Maricopa Indian Community, Maricopa County, Arizona (1991)
DOCUMENT Full-Text David H. Greenwald.

On December 27, 1990, SWCA, Inc. Environmental Consultants, conducted an archaeological survey on the Salt River Pima and Maricopa Indian Reservation for Salt River Project for a proposed substation. Approximately 2.07 acres located in a modern field were surveyed. Isolated artifacts consisted of a single piece of heat-altered rock and five pieces of mafic igneous flaked debitage. Archival investigations revealed that the project area is located in the extreme northwestern portion of Pueblo...


A Cultural Resources Survey of the Proposed Salt River Project Central Support Complex Parcel in Tempe, Maricopa County, Arizona (1986)
DOCUMENT Full-Text Scott L. Fedick.

On February 27, 1986, Scott L. Fedick of Archaeological Research Services, Inc. (ARS), performed a cultural resources survey at the proposed location of the Salt River Project Central Support Complex. The survey was undertaken at the request of Salt River Project in order to determine if cultural resources, which may include prehistoric or historic archaeological sites or objects, historically or architecturally significant structures or buildings, were present which could be affected by...


Cultural Resources Survey of the Quail to Florence Junction 69 kV Subtransmission Line Easement on State Trust Land, Pinal County, Arizona (2012)
DOCUMENT Full-Text Connie A. Darby.

This report presents the results of a Class III cultural resources survey of a portion of the right-of-way corridor for a new 69 kV subtransmission line that will extend between the Salt River Project Agricultural Improvement and Power District (SRP) Quail Substation, located southeast of Queen Creek, and the Florence Junction Substation, west of Florence Junction, Arizona. The survey was requested by SRP to determine if significant cultural resources were present within the right-of-way...


Cultural Resources Survey of the Salt River Project Canals, Maricopa County, Arizona, Revised (1998)
DOCUMENT Full-Text Lourdes Aguila.

Archaeological Consulting Services, Ltd. (ACS) conducted a Class III (Intensive), non-collection cultural resources survey on approximately 170 miles of the Arizona, Arizona Crosscut, Grand, Tempe, Tempe Crosscut, Consolidated, Eastern, South, Western, Highline, and Kyrene Branch Canals in Maricopa County, Arizona. The survey was undertaken at the request of Jon S. Czaplicki, U.S. Bureau of Reclamation (Reclamation) archaeologist and Contracting Officer's Technical Representative for Contract...


Data Recovery Plan for the SRP Browning to Dinosaur 230 kV Transmission Line, Pinal County, AZ (2006)
DOCUMENT Full-Text T. Kathleen Henderson.

Salt River Project (SRP) plans to construct a new 230 kV transmission line between the Browning and Dinosaur substations east of Mesa and Queen Creek, Arizona. A cultural resources survey has determined that portions of three archaeological sites that meet criteria for inclusion on the National Register of Historic Places are present within the transmission line corridor (Henderson 2005). Desert Archaeology, Inc., has prepared this plan at the request of SRP to conduct phased data recovery...


Data Recovery Plan for U.S. West Communications Utility Right-of-Way near Pueblo Grande National Historic Landmark, Phoenix, Maricopa County (1993)
DOCUMENT Full-Text Shereen Lerner, Ph.D..

Archaeological Consulting Services, Ltd. (ACS) is serving as a consultant to U.S. West Communications (US West) for a proposed utility (fiber optic communication cable) right-of-way. The right-of-way is located within the southern access road for the Grand Canal, which passes through Pueblo Grande National Historic Landmark (Pueblo Grande), although the proposed right-of-way is not within the National Historic Landmark boundary. The site was listed on the National Register of Historic Places...


The Dinosaur: Archaeological Investigations Within the Gila River Valley for the Salt River Project's Pinal Central to Dinosaur 500 kV Transmission Line, Pinal County, Arizona (2010)
DOCUMENT Full-Text Uploaded by: adam brin

Salt River Project Agricultural Improvement and Power District (SRP) plans to construct an 88-mile-long 500-kV extra-high voltage transmission line linking the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur substations (ACC CEC Case No. 126). This report presents the results of Phase I data recovery (extent testing) and Phase II data recovery within a 40-m- (130-ft-) wide corridor at seven sites located on State Trust Land administered by the Arizona State Land Department (ASLD) (ASLD...


The Eastern Mining Area 115 kV Transmission Line Survey: Archaeological Resources in the Salt-Gila Uplands of Central Arizona (1996)
DOCUMENT Full-Text Thomas N. Motsinger. Heidi Roberts. Richard V. N. Ahlstrom.

SWCA Inc, Environmental Consultants of Tucson, Arizona, conducted Eastern Mining Area (EMA) survey project under contract to Salt River Project (SRP) between October 1993 and February 1994. One central purpose of the project was to create an inventory of archaeological resources to assist in the planning of future improvements and other modifications to existing SRP transmission lines. The project included 107 person-field days of Class III archaeological survey along approximately 257 linear...


HAER No. AZ-14, Mormon Flat Dam, Maricopa County, Arizona: Photographs, Written Historical and Descriptive Data, Reduced Copies of Drawings (1989)
DOCUMENT Full-Text David M. Introcaso.

This Historic American Engineering Record for the Mormon Flat Dam contains photographs, dating from 1924-1988, and descriptive data concerning the dam's construction and use. Mormon Flat Dam was the first dam constructed under the Salt River Project's 1920's hydroelectric expansion program. Currently, the dam is operated by the Salt River Project for the purposes of generating hydroelectric power and for storing approximately 57,000 acre feet of water for agricultural and urban uses.


HAER No. AZ-15, Horse Mesa Dam, Maricopa County, Arizona: Photographs, Written Historical and Descriptive Data, Reduced Copies of Drawings (1989)
DOCUMENT Full-Text David M. Introcaso.

This Historic American Engineering Record includes photographs of the Horse Mesa Dam, dating from 1924-1988, and accompanying written historical and descriptive data. The Horse Mesa Dam is operated by the Salt River Project for the purposes of generating hydroelectric power and for storing approximately 245,000 acre feet of water for agricultural and urban uses. Horse Mesa Dam was the second dam constructed under the Salt River Project's 1920's hydroelectric expansion program.


HAER No. AZ-17 and AZ-30, Grand Canal and Crosscut Hydro Plant, North Side of Salt River, Tempe and Phoenix, Maricopa County, Arizona: Photographs, Written Historical and Descriptive Data, Reduced Copies of Drawings (1990)
DOCUMENT Full-Text Fred Andersen. Carol Noland.

Historic American Engineering Record (HAER) No. AZ-17 presents a written historical summary and relevant historical documentation about the construction and use of Grand Canal, which delivers water to users on the north side of the Salt River for agricultural, industrial, and municipal uses. Historic American Engineering Record (HAER) No. AZ-30 provides similar documentation about the construction and operation of the Crosscut Hydroelectric Plant, which sits at the head of Grand Canal and relies...


HAER No. AZ-19, Arizona Canal, North of the Salt River, Phoenix Vicinity, Maricopa County, Arizona: Photographs, Written Historical and Descriptive Data, and Reduced Copies of Drawings (1991)
DOCUMENT Full-Text Shelley C. Dudley.

The Arizona Canal is the northernmost canal in the water distribution system of the Salt River Project, located within the urban center of Phoenix in Central Arizona. The Salt River Valley, at the time of the canal's construction in 1883, already had canals on both the north and south side of the Salt River irrigating portions of the Valley. Yet the men who organized the Arizona Canal Company saw the scorched, desolate desert in the northern part of the Valley and envisioned thousands of...


HAER No. AZ-20, Crosscut Steam Plant, Tempe, Maricopa County, Arizona: Photographs, Written Historical and Descriptive Data (1991)
DOCUMENT Full-Text Barbara Behan.

Historic American Engineering Record (HAER) No. AZ-20 presents a written historical summary and relevant historical documentation about the construction and use of the Crosscut Steam Plant, which provided the first non-hydroelectric power to Salt River Project customers in the Phoenix metropolitan area. The report contains a narrative description, photographs, drawings, and maps. The Crosscut Steam Plant facility is located in Tempe, AZ, near Mill Avenue and Washington Street on the north...


HAER No. AZ-21, Old Crosscut Canal, North Side of Salt River, Maricopa County, Arizona: Photographs, Written Historical and Descriptive Data (1991)
DOCUMENT Full-Text Fred Andersen.

Historic American Engineering Record for the Old Crosscut Canal, which includes photographs and descriptive data concerning the construction and use of the canal. The Old Crosscut Canal was originally built to connect to Arizona Canal with the other northside canals. It served this function to some degree until 1913, when it was replaced by the New Crosscut some two miles east. The Old Crosscut remained, but has not been used for irrigation since. Beginning in the 1920s it was used to help...


HAER No. AZ-22, Western Canal, South Side of Salt River, Mesa, Tempe and Phoenix, Maricopa County, Arizona: Photographs, Written Historical and Descriptive Data, Reduced Copies of Drawings (1990)
DOCUMENT Full-Text Fred Andersen.

Together, Historic American Engineering Records (HAER) Nos. AZ-22 and AZ-23 present a written historical summary and relevant historical documentation about the construction and use of the Western Canal and the Highline Canal, which are waterways that serve Mesa, Chandler, Tempe, and parts of south Phoenix, Arizona on the south side of the Salt River. This report, Historic American Engineering Record (HAER) No. AZ-22, presents a narrative history of both canals and their infrastructure features....


HAER No. AZ-23, Highline Canal, South Side of the Salt River, Tempe and Phoenix, Maricopa County, Arizona: Photographs, Reduced Copied of Drawings (1990)
DOCUMENT Full-Text Fred Andersen.

Together, Historic American Engineering Records (HAER) Nos. AZ-22 and AZ-23 present a written historical summary and relevant historical documentation about the construction and use of the Western Canal and the Highline Canal, which are waterways that serve Mesa, Chandler, Tempe, and parts of south Phoenix, Arizona on the south side of the Salt River. HAER No. AZ-22 (see https://core.tdar.org/document/393529) presents a narrative history of both canals and their infrastructure features. It also...


HAER No. AZ-24, Horseshoe Dam, Technical Report (1991)
DOCUMENT Full-Text Donald C. Jackson. Clayton B. Fraser.

This report provides a written narrative of the events leading to the construction of Horseshoe Dam on the Verde River, in Central Arizona. Horseshoe Dam was constructed between 1944 and 1946 by the Salt River Valley Water Users' Association and the Phelps Dodge Copper Company. The dam provides water storage for irrigation and domestic use.


HAER No. AZ-25, Bartlett Dam, Verde River, Phoenix Vicinity, Maricopa County, Arizona: Photographs, Written Historical and Descriptive Data (1990)
DOCUMENT Full-Text David M. Introcaso.

Historic American Engineering Record (HAER) No. AZ-25 presents a written historical summary and relevant historical documentation about the construction and use of Bartlett Dam, which impounds the Verde River 50 miles northeast of Phoenix, Arizona to create Bartlett Reservoir. The report contains a narrative description, photographs, drawings, and maps. The Bartlett Dam is a major component of the Salt River Project's water supply system that provides Verde River water for agricultural,...


HAER No. AZ-51, Granite Reef Diversion Dam, Salt River, Mesa Vicinity, Maricopa County, Arizona: Written Historical and Descriptive Data, Photographs, and Reduced Copies of Drawings (1998)
DOCUMENT Full-Text Tonia Woods Horton.

Located approximately thirty miles east of Phoenix, Arizona, adjacent to the city of Mesa, and three miles downstream from the confluence of the Salt and Verde Rivers, Granite Reef Diversion Dam is the principal diversion structure supplying water to the Salt River Project irrigation canals on either side of the Salt River. Although overshadowed in size by the Theodore Roosevelt Dam - the first structure of the Salt River Project proposed by the Department of the Interior's newly formed U.S....


HAER No. AZ-52, South Canal, South of the Salt River, Mesa Vicinity, Maricopa County: Written Historical and Descriptive Data, Photographs, and Reduced Copies of Drawings (1998)
DOCUMENT Full-Text Shelly C. Dudley.

The U.S. Reclamation Service constructed the South Canal to carry water to the farmers on the south side of the Salt River as part of the Salt River Federal Reclamation Project. Built between 1907 and 1909, the original canal measured only two miles and diverted water from the newly erected Granite Reef Dam. The South Canal eventually became the only irrigation structure to divert water directly from the Salt River and deliver it to the south side shareholders of the Salt River Valley Water...


HAER No. AZ-6-B, Eastern Mining Area Transmission Line (the 115kV System), Gila County, Arizona: Photographs, Written Historical and Descriptive Data (1996)
DOCUMENT Full-Text Leah S. Glaser.

The Eastern Mining Area transmission line was first built to carry hydroelectric power generated at Roosevelt Dam, the United States Bureau of Reclamation’s first large scale work, into Phoenix. It soon expanded to serve the area mines the southern portion of Gila County. The sale of power to these mines provided revenue to expand the Salt River Project’s hydroelectric system and furnish Salt River Valley farmers with electricity.


HAER No. AZ-7, Coolidge Dam, Pinal County, Arizona: Photographs, Written Historical and Descriptive Data, and Reduced Copies of Drawings (1986)
DOCUMENT Full-Text David M. Introcaso.

Coolidge Dam was authorized in 1924 and was completed in 1928. It was built by the U.S. Indian Service. Today Coolidge Dam supplies water from the Gila River to the Gila River Indian Community and to non-Indian growers as well. This report satisfies Historic American Engineering Record (HAER) standards as established by the National Park Service. A copy of this report, along with a complete set of archival negatives and photographs, has been deposited in the HAER collection at the Library of...


Historic Documentation of Lateral 19 of the Grand Canal, Located Along 67th Avenue Between Lower Buckeye Road and Broadway Road, Maricopa County, Arizona (2008)
DOCUMENT Full-Text Judith Breen.

Tolleson Union High School District plans to construct a high school on the west side of 67th Avenue between Lower Buckeye Road and Broadway Road. As part of the construction project, the road will be widened in front of the new school, which will necessitate that a segment of a historic open lateral be piped underground. ADM Group Inc., the project architects, requested that Logan Simpson Design Inc. prepare a report documenting the history of the lateral.


The Kayenta Anasazi: Archaeological Investigations Along the Black Mesa Railroad Corridor, Volume 1 - Specialists' Reports (1986)
DOCUMENT Full-Text Sara Stebbins. Bruce Harrill. William D. Wade. Marsha V. Gallagher. Hugh Cutler. Leonard Blake.

In 1969 the Salt River Project contracted the Museum of Northern Arizona (MNA) to excavate the prehistoric and ethnohistoric remains in the vicinity of the Navajo Generating Station (Page, Arizona), along the Black Mesa-Lake Powell railroad corridor, and in the immediate vicinity of the coal loading facility at the east end of the rail line south of Navajo National Monument. One hundred and twenty-three sites were identified, with 51 of those prehistoric sites excavated or tested. (The...


Kyrene Data Recovery Preliminary Field Report (For the South Half of the Pole Yard Locus) (2001)
DOCUMENT Full-Text Salt River Project. SWCA Environmental Consultants.

This document is the second preliminary report on archaeological data recovery at a portion of the Hohokam village of Los Guanacos (AZ U:9:116 [ASM]). This report focuses on the preliminary results of the south half of the Pole yard locus while the first report discussed the north half of the locus. The contents of this preliminary report discuss the goals for the south half of the locus. Salt River Project (SRP) is proposing to construct a new generating station adjacent to the existing Kyrene...