Phalange (Human) (Other Keyword)
1-4 (4 Records)
At the request of U S West Communications (US West), Archaeological Consulting Services, Ltd. (ACS) performed archaeological monitoring along a utility right-of-way. The right-of-way is within the south side access road for the Grand Canal, which passes through the City of Phoenix administered Pueblo Grande National Historic Landmark (Pueblo Grande; AZ U:9:7(ASM)). The canal is administered by the Salt River Project and owned by the Bureau of Reclamation. Limited testing within the right-of-way...
The Roosevelt Community Development Study, Number 14, Volume 3: Paleobiological and Osteological Analyses (1995)
The Roosevelt Community Development Study (RCD) involved the testing and excavation of 27 sites in the Lower Tonto Basin of central Arizona. This is one of three related data recovery projects undertaken in the Tonto Basin for the Bureau of Reclamation prior to the raising of the Roosevelt Lake dam. The results of the RCD project are presented in four Anthropological Papers of the Center for Desert Archaeology: Anthropological Papers No. 12 is the research design; Anthropological Papers No. 13...
Settlement, Subsistence, and Specialization In the Northern Periphery: The Waddell Project. Vols. 1 and 2 (1989)
Under the sponsorship of the Bureau of Reclamation, the New Waddell Dam Borrow Areas Mitigative Data Recovery Project, more simply known as the Waddell Project, performed data recovery at 17 sites in the vicinity of Lake Pleasant, Arizona. Supplemental surveys conducted under the same contract added two sites to the inventory slated for investigation. The project area, composed of multiple survey areas, was spread across two drainages, the Agua Fria and New River, in what is considered the...
Trenching South of the Grand Canal at Pueblo Grande, Phoenix, Maricopa County, Arizona (1993)
At the request of Janice Cunningham of U.S. West Communication (US West), Archaeological Consulting Services, Ltd. (ACS) performed subsurface testing along a proposed utility (fiber optic communication cable) right-of-way. The right-of-way will be located within the southern access road for the Grand Canal, which passes through Pueblo Grande Historic Landmark (Pueblo Grande). The canal is owned by the Bureau of Reclamation (Reclamation) and administered by the Salt River Project (SRP)....