National Register of Historic Places (Other Keyword)

National Register , U.S. National Register of Historic Places , NRHP , National Register of Historical Places , National Register Historic Places , National Register of Historic Place , National Register for Historic Places , NRHP Historic Site

801-806 (806 Records)

Why the Swartz Cabin at Peabody's Site (5Pa199) Should Be Placed On the National Register of Historic Places (1982)
DOCUMENT Citation Only Darlene Swartz. D. Minner. H. Gardner.

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.


Work of a Master? Addressing Evaluation of Routine or Prosaic Architecture by Famous Architects on Military Facilities (Legacy 15-779)
PROJECT Uploaded by: McKenna McMahon

This project outlined the challenges of evaluating military buildings under the "work of a master" standard of NRHP Criterion C and details research and analysis approaches.


Work of a Master? Addressing Evaluation of Routine or Prosaic Architecture by Famous Architects on Military Facilities - Flow Chart (Legacy 15-779) (2017)
DOCUMENT Full-Text Rand Herbert. Joseph Freeman.

This flow chart resulted from a project that outlined the challenges of evaluating military buildings under the "work of a master" standard of NRHP Criterion C and details research and analysis approaches.


Work of a Master? Addressing Evaluation of Routine or Prosaic Architecture by Famous Architects on Military Facilities - Report (Legacy 15-779) (2017)
DOCUMENT Full-Text Rand Herbert. Joseph Freeman.

This document outlines the challenges of evaluating military buildings under the "work of a master" standard of NRHP Criterion C and details research and analysis approaches. The guidance contains case studies and reference tools, including an annotated list of standard sources for performing evaluations, a reference checklist, and guidance on consulting with SHPO reviewers.


Work Plan for Conducting Data Collection and Site Stabilization for Four Endangered Archaeological Sites (LA 38136, LA 38910, LA 112472, and LA 148019) Located on Lands Owned by the US Air Force and on Cibola National Forest Lands Withdrawn to Kirtland Air Force Base (2005)
DOCUMENT Full-Text James D. Gallison. David J. Kilby.

Work plan for site stabilization of four sites threatened by either erosion or construction at Kirtland Air Force Base.


World War II P-38G-10-LO Aircraft Restoration and Historical Context (2002)
DOCUMENT Full-Text John H. Cloe.

This study was prepared in part to satisfy the need to document the planning, recovery, restoration, and display of Lockheed P-38G-10-LO, serial number 42-13400, the "Lightning". The Lightning is the only one remaining of the 1,082 G models produced during World War II. It is one of approximately 26 Lightnings remaining of the 10,038 produced. It was also the first aircraft to be listed on the National Register of Historic Places. The study also provides additional documentation supporting the...