In 1978, the Bureau of Reclamation (Reclamation) directed the Museum of Northern Arizona (MNA) to complete an intensive archaeological survey of the proposed alignment for the Salt-Gila Aqueduct, a feature of the Central Arizona Project. The survey area was 11,115 acres and included the 60 mile-long transmission line (with a typical width of 200 meters), three proposed utility line locations, one flood retention dike location, 11 possible spoil or realignment areas, and a subsidence well....
Mitigation Plan for the Salt-Gila Aqueduct (1979)
In 1978, the Bureau of Reclamation (Reclamation) directed the Museum of Northern Arizona (MNA) to complete an intensive archaeological survey of the proposed alignment for the Salt-Gila Aqueduct, a feature of the Central Arizona Project. The survey area was 11,115 acres and included the 60 mile-long transmission line (with a typical width of 200 meters), three proposed utility line locations, one flood retention dike location, 11 possible spoil or realignment areas, and a subsidence well....