The Federal Highway Administration (FHWA) and the Arizona Department of Transportation (ADOT) are planning a spot improvement and pavement preservation project along State Route (SR) 88, also known as the Apache Trail between Milepost (MP) 203.40 and MP 220.20, northeast of the town of Apache Junction, Maricopa County, Arizona. The construction project would involve milling the existing pavement and replacing it with new pavement; stabilizing shoulders, paving existing and new turnouts and...
Cultural Resources Monitoring of Roadway Improvements along Historic State Route 88 between Mileposts 203.40 and 220.20, Northeast of Apache Junction, Maricopa County, Arizona (2018)
FHWA and ADOT completed a roadway improvement project along Historic SR-88, also known as the Apache Trail, between MP 203.40 and MP 220.20, northeast of the town of Apache Junction, Maricopa County, Arizona. The undertaking included milling existing pavement and laying new pavement along SR-88 between MP 203.40 and 213.35; applying a double application of chip seal coat on the existing roadway between MP 213.35 and MP 220.20; removing the pavement at 5 existing pullouts; constructing new...
A Cultural Resources Survey of 17.5 Miles of State Route 88, the Apache Trail, Between Apache Junction and Tortilla Flat, Pinal and Maricopa Counties, Arizona (1995)
Between April 15 and June 14, 1993, Archaeological Research Services, Inc. performed a cultural resources survey of State Route 88 (the Apache Trail). The right-of-way varies from 66 to 200 feet, but construction as-builts were not available. Therefore, the Arizona Department of Transportation requested that a 200 foot wide right-of-way be surveyed for the entire project length unless clearly marked property boundaries or other right-of-way indications were present. The 17.5 mile long survey...