AZ T:4:25 (ASM) (Site Name Keyword)

1-2 (2 Records)

Final Report for Plan 6 Supplemental Cultural Resource Surveys (1985)
DOCUMENT Full-Text Margerie Green.

This final report includes eight reports representing close to 6,000 acres of survey performed in the vicinity of the planned New Waddell Dam. The survey areas include locations for geologic test trenches, road relocations, borrow areas, spillways, and the Waddell Canal. These surveys yielded a total of 43 sites and 2018 loci of isolated artifacts. All but one of the sites were located in two borrow areas. These two study areas evidence differences in use of habitation, agriculture and artifact...


Settlement, Subsistence, and Specialization In the Northern Periphery: The Waddell Project. Vols. 1 and 2 (1989)
DOCUMENT Full-Text Uploaded by: system user

Under the sponsorship of the Bureau of Reclamation, the New Waddell Dam Borrow Areas Mitigative Data Recovery Project, more simply known as the Waddell Project, performed data recovery at 17 sites in the vicinity of Lake Pleasant, Arizona. Supplemental surveys conducted under the same contract added two sites to the inventory slated for investigation. The project area, composed of multiple survey areas, was spread across two drainages, the Agua Fria and New River, in what is considered the...